My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections, tests, and approvals that the results 2. changes in the Contract Price or <br /> certified indicate compliance with, the Contract Contract Times which are agreed to by the <br /> Documents. parties, including any undisputed sum or <br /> amount of time for Work actually performed in <br /> E. The limitations upon authority and responsibil- accordance with a Work Change Directive; and <br /> ity set forth in this paragraph 9.10 shall also apply to <br /> ENGINEER's Consultants, Resident Project Repre- 3. changes in the Contract Price or <br /> sentative, and assistants. Contract Times which embody the substance of <br /> any written decision rendered by ENGINEER <br /> ARTICLE 10-CHANGES IN THE WORK; CLAIMS pursuant to paragraph 10.05; provided that, in <br /> lieu of executing any such Change Order, an <br /> appeal may be taken from any such decision in <br /> 10.01 Authorized Changes in the Work accordance with the provisions of the Contract <br /> Documents and applicable Laws and Regula- <br /> A. Without invalidating the Agreement and tions, but during any such appeal, <br /> without notice to any surety, OWNER may, at any time CONTRACTOR shall carry on the Work and <br /> or from time to time, order additions, deletions, or adhere to the progress schedule as provided in <br /> revisions in the Work by a Written Amendment, a paragraph 6.18.A. <br /> Change Order, or a Work Change Directive. Upon <br /> receipt of any such document, CONTRACTOR shall 10.04 Notification to Surety <br /> promptly proceed with the Work involved which will be <br /> performed under the applicable conditions of the A. If notice of any change affecting the general <br /> Contract Documents (except as otherwise specifically scope of the Work or the provisions of the Contract <br /> provided). Documents (including, but not limited to, Contract <br /> Price or Contract Times) is required by the provisions <br /> B. If OWNER and CONTRACTOR are unable to of any Bond to be given to a surety, the giving of any <br /> agree on entitlement to, or on the amount or extent, if such notice will be CONTRACTOR's responsibility. <br /> any, of an adjustment in the Contract Price or Contract The amount of each applicable Bond will be adjusted <br /> Times, or both, that should be allowed as a result of a to reflect the effect of any such change. <br /> Work Change Directive, a Claim may be made <br /> therefor as provided in paragraph 10.05. <br /> 10.02 Unauthorized Changes in the Work <br /> A. CONTRACTOR shall not be entitled to an <br /> increase in the Contract Price or an extension of the <br /> Contract Times with respect to any work performed <br /> that is not required by the Contract Documents as <br /> amended, modified, or supplemented as provided in <br /> paragraph 3.04, except in the case of an emergency <br /> as provided in paragraph 6.16 or in the case of <br /> uncovering Work as provided in paragraph 13.04.6. <br /> 10.03 Execution of Change Orders <br /> A. OWNER and CONTRACTOR shall execute <br /> appropriate Change Orders recommended by ENGI- <br /> NEER(or Written Amendments) covering: <br /> 1. changes in the Work which are: (i) <br /> ordered by OWNER pursuant to paragraph <br /> 10.01.A, (ii) required because of acceptance of <br /> defective Work under paragraph 13.08.A or <br /> OWNER's correction of defective Work under <br /> paragraph 13.09, or (iii) agreed to by the <br /> parties; <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-30 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert ImprovementlAdmim\bid documents\00700-General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.