My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.05 Claims and Disputes <br /> C. If ENGINEER does not render a formal <br /> A. Notice: Written notice stating the general nature decision in writing within the time stated in paragraph <br /> of each Claim, dispute, or other matter shall be 10.05.13, a decision denying the Claim in its entirety <br /> delivered by the claimant to ENGINEER and the other shall be deemed to have been issued 31 days after <br /> party to the Contract promptly (but in no event later receipt of the last submittal of the claimant or the last <br /> than 30 days) after the start of the event giving rise submittal of the opposing party, if any. <br /> thereto. Notice of the amount or extent of the Claim, <br /> dispute, or other matter with supporting data shall be D. No Claim for an adjustment in Contract Price <br /> delivered to the ENGINEER and the other party to the or Contract Times (or Milestones) will be valid if not <br /> Contract within 60 days after the start of such event submitted in accordance with this paragraph 10.05. <br /> (unless ENGINEER allows additional time for claimant <br /> to submit additional or more accurate data in support <br /> of such Claim, dispute, or other matter). A Claim for ARTICLE 11 -COST OF THE WORK; CASH <br /> an adjustment in Contract Price shall be prepared in ALLOWANCES; UNIT PRICE WORK <br /> accordance with the provisions of paragraph 12.01.13. <br /> A Claim for an adjustment in Contract Time shall be <br /> prepared in accordance with the provisions of 11.01 Cost of the Work <br /> paragraph 12.02.13. Each Claim shall be accom- <br /> panied by claimant's written statement that the adjust- A. Costs Included: The term Cost of the Work <br /> ment claimed is the entire adjustment to which the means the sum of all costs necessarily incurred and <br /> claimant believes it is entitled as a result of said event. paid by CONTRACTOR in the proper performance of <br /> The opposing party shall submit any response to the Work. When the value of any Work covered by a <br /> ENGINEER and the claimant within 30 days after Change Order or when a Claim for an adjustment in <br /> receipt of the claimant's last submittal (unless Contract Price is determined on the basis of Cost of <br /> ENGINEER allows additional time). the Work, the costs to be reimbursed to <br /> CONTRACTOR will be only those additional or <br /> B. ENGINEER's Decision: ENGINEER will incremental costs required because of the change in <br /> render a formal decision in writing within 30 days after the Work or because of the event giving rise to the <br /> receipt of the last submittal of the claimant or the last Claim. Except as otherwise may be agreed to in <br /> submittal of the opposing party, if any. ENGINEER's writing by OWNER, such costs shall be in amounts no <br /> written decision on such Claim, dispute, or other higher than those prevailing in the locality of the <br /> matter will be final and binding upon OWNER and Project, shall include only the following items, and <br /> CONTRACTOR unless: shall not include any of the costs itemized in para- <br /> graph 11.01.B. <br /> 1. an appeal from ENGINEER's <br /> decision is taken within the time limits and in 1. Payroll naete far employees in +ho <br /> accordance with the dispute resolution <br /> procedures set forth in Article 16; or <br /> ala��iFaa+iane agreed upon by (1VVNF=R and <br /> 2. if no such dispute resolution <br /> procedures have been set forth in Article 16, a without ' itatian superintendents, foremen, <br /> written notice of intention to appeal from and GtheF personnel ernp!Gyed full tome at the <br /> ENGINEER's written decision is delivered by Site Pa��r '�GstS fGF emp;Gyee s net <br /> OWNER or CONTRACTOR to the other and to full tirne on the Work shall be appeptioned on <br /> ENGINEER within 30 days after the date of the—basis of their ttirne spent cm the Work. <br /> such decision, and a formal proceeding is <br /> instituted by the appealing party in a forum of salaries and wages plus the aaSt of fringee <br /> competent jurisdiction within 60 days after the benefits, whish—shall i eSGA-iiaTseG <br /> date of such decision or within 60 days after <br /> Substantial Completion, whichever is later <br /> (unless otherwise agreed in writing by OWNER and retirement benefits, bonuses, S— Gk—leave, <br /> and CONTRACTOR), to exercise such rights orvar-,atieR ;and holiday pay appliGable . <br /> remedies as the appealing party may have with The expenses of pnrfarmina Werk outside of <br /> respect to such Claim, dispute, or other matter regular weFking hours, en Saturday, Sunday, e <br /> in accordance with applicable Laws and <br /> Regulations. the extent ai itherized by QlAINFR <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-31 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert ImprovementWdmim\bid documents\00700-General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.