Laserfiche WebLink
SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> T � r <br /> and <br /> (hereinafter called CONTRAC OR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> Proposed improvements include the excavation and relocation of the existing <br /> driving range tee box, construction of a 12' wide concrete cart path and curbing. Also <br /> included is grass sprigging and sodding of tee and driving range area, irrigation and <br /> drainage improvements. <br /> ARTICLE 2 - THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: Sandridge Golf Course — Driving Range Tee Renovations <br /> County Project Number: 1210 i <br /> Bid Number: 2012040 <br /> Project Address: 5300 73rd Street Vero Beach, FI. 32967 <br /> ARTICLE 3 — ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 45th day after the date when <br /> the Contract Times commence to run as provided in paragraph 2.03 of the General <br /> Conditions, and completed and ready for final payment in accordance with paragraph <br /> 14.07 of the General Conditions on or before the 52nd day after the date when the <br /> Contract Times commence to run. <br /> 2012040 Agreement <br /> 00520-2 <br /> FAPurchas1ng\Bids\2011-2012 FY(2012000)\2012040 Sandridge Driving Range Expansion=2040 Agreement.doc <br />