Laserfiche WebLink
r, <br />MAY 111N <br />BOOK <br />ENGINEERING/ARCHITECTURAL DESIGN SERVICES FOR VARIOUS PROJECTS <br />The Board reviewed the following memo dated 5/19/92: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E <br />Public Works Directo <br />SUBJECT: Engineering/Architectural Design <br />Services for Various Project <br />DATE: May 19, 1992 FILE: projects.agn <br />DESCRIPTION AND CONDITIONS <br />As authorized by the Board of County Commissioners last month, <br />the County staff received Fee Proposals and Statement of <br />Qualifications from local engineers and architects on Wednesday, <br />May 13, 1992 for the following Projects: <br />1) Hobart Road (77th St) Paving and Drainage from Old Dixie <br />Highway to Rings Highway. <br />2) 37th St.(Barber Ave) Widening/Resurfacing from US 1 to <br />Indian River Boulevard. <br />3) Gifford Park Parking Lots and Court Resurfacing. <br />4) Hobart Ballfield Lighting. <br />5) Fairgrounds Restroom Building <br />ALTERNATIVES AND ANALYSIS <br />The attached tabulation .sheets have been prepared by staff <br />summarizing the proposals received. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the following consultants be selected to <br />perform design services as defined in the attached contracts: <br />1) Hobart Road Paving and Drainage - Marshall -McCully, Inc. <br />2) 37th St.(Barber Av) Widening - H.F. Lenz Co. <br />3) Gifford Park Parking Lot and Court Resurfacing - Peterson/ <br />Votapka <br />4) Hobart Park Ballfield Lighting - Mosby and Assoc., Inc./ <br />Wojcieszak <br />5) Fairgrounds Restroom Building - Edlund & Dritenbas <br />Architects <br />Short form contracts will be prepared and will be placed on a <br />future agenda. Funding will be from Transportation fund (Fund <br />111) or Parks Department budgeted funds. <br />28 <br />_I <br />