Laserfiche WebLink
THE RESERVE AT VERO BEACH- OPC 2/16/2016 <br />(ALL COMPLETED BUT NON -CERTIFIED UTILITIES SHOWN AS.90% COMPLETE) <br />EARTHWORK , <br />UNIT <br />QUANTITY <br />UNIT COST <br />TOTAL COST <br />INCOMPLETE <br />% COMPLETE <br />MOBILIZATION <br />LS <br />1 <br />$10;000.00 <br />$10,000.00 <br />$2,500.00 <br />75 <br />EXCAVATE AND GRADE POND <br />CY <br />31,200 <br />$2.50 <br />$78,000.00 <br />$3,900.00 <br />95 <br />FINALGRADING <br />LS <br />1 <br />$21,000.00 <br />$21,000.00 <br />$5,250.00 <br />75 <br />SODDING I <br />SF <br />93,149 <br />$0.20 <br />$18,629.80 <br />$18,629.80 <br />0 <br />EROSION CONTROL <br />"LS <br />1" - <br />$20,000.00 <br />$20,000.00 <br />$2,000.00 <br />90 <br />IRRIGATION <br />LS <br />1. <br />$90,000.00 <br />$90,000.00 <br />$90,000.00 <br />0 <br />SUBTOTAL PROFESSIONAL SERVICES <br />LF <br />275 <br />$42.61 <br />$237,629.80 <br />$122,279.80 <br />492 C ENS <br />4' SANITARY MANHOLE (0'-6') <br />LF <br />2 <br />$2,807.30 <br />$5,614.60 <br />$561.46 <br />C� 3�=I%itv <br />POTABLE WATER <br />U_ NITQUANTITY <br />3 <br />UNIT COST <br />TOTAL COST <br />INCOMPLETE <br />%COMPLETE <br />4° C-900 PVC/Dl <br />LF <br />251 <br />$15:00 <br />$3,765.00 <br />$37---- <br />90 <br />6" C-900 PVC/DI I <br />LF <br />145 <br />$17.57 <br />$2,547.65 <br />$254.77 <br />90 <br />8" C-900 PVC/DI <br />LF <br />2,067 <br />$18.27 <br />$37,764.09 <br />$3;776.41 <br />90 <br />16"C-900 PVC/Dl <br />LF <br />769 <br />$56.44 <br />$43,402.36 <br />$4,340.24 <br />90 <br />CONNECTTO EXISTING 16" & 12" <br />EA <br />2 <br />$3,378.13 <br />$6,156.26 <br />$675.63 <br />90 <br />16^x8"TEE <br />EA <br />1 <br />$1,538.13 <br />$1;538.13 <br />$153.81 <br />90 <br />16" x12" REDUCER <br />EA <br />1. <br />$973.48 <br />$973.48 <br />$97.35 <br />90 <br />16" G.V. <br />EA <br />2 <br />$6,256.30 <br />$12,512.60 <br />$1,251:26 <br />90 <br />8"G.V. <br />EA <br />9 <br />$1,321.65 <br />$11,894.85 <br />$1,189.49 <br />90 <br />6" G.V. <br />EA <br />7 <br />$1,000:00 <br />$7;000.00 <br />$700:00 <br />90 <br />4' G.V. <br />EA <br />8 <br />$800.00 <br />$6,400.00 <br />$640.00 <br />90 <br />8' x W' TEE <br />EA_ <br />4 <br />$644.06 <br />$2,576.06 <br />$257.66 <br />90 <br />8" x 6" TEE <br />EA <br />5 <br />$603.18 <br />$3,015.90 <br />$301.59 <br />90 <br />16"45 BEND <br />EA <br />3 <br />$i,538.13 <br />$4,61439 <br />$461.44 <br />90 <br />8"45 BEND <br />EA <br />3 <br />$419.75 <br />$1,259.25 <br />$125.93 <br />90 <br />8" 22.5 BEND <br />EA <br />4 <br />$417.01 <br />$1,668.04 <br />$166.80 <br />90 <br />B!'11.5 BEND <br />EA <br />1. <br />$413.15 <br />$413.15 <br />$41.32 <br />90 <br />FIRE HYDRANT ASSEMBLY <br />EA <br />7 <br />$3,261.98 <br />$22,833.86 <br />$2,283.39 <br />9014 <br />8"X8' TAPPING SLEEVE EA. <br />50 <br />SUBTOTAL WATER <br />$175,477.51 <br />$17,547:75 <br />LNA <br />SANITARY SEWER <br />UNIT <br />QUANTITY <br />UNIT COST <br />TOTAL COST <br />INCOMPLETE <br />% COMPLETE <br />8" PVC SDR -26 (0'-6'j <br />LF <br />291 <br />$27.69 <br />$8,057.79 <br />$805.78 <br />90 <br />8" PVCSOR-26 (6'-8') <br />IF <br />390 <br />$29.03 <br />$11,321.70 <br />$1;132.17 <br />90 <br />8" PVC SDR -26 (8'-10') <br />LF <br />418 <br />$34.81 <br />$14,550.58 <br />$1,455.06 <br />90 <br />s" PVC SDR -26 (10'-12') <br />LF <br />275 <br />$42.61 <br />$11,717:75 <br />$1,171.78 <br />90 <br />4' SANITARY MANHOLE (0'-6') <br />LF <br />2 <br />$2,807.30 <br />$5,614.60 <br />$561.46 <br />90 <br />4' SANITARY MANHOLE (6'-8') <br />LF <br />3 <br />$3;491.55 <br />$10,474.65 <br />$1;047.47 <br />90 <br />4' SANITARY MANHOLE (8'-16') <br />LF <br />2 <br />$4,196.99 <br />$8,393.98 <br />$839.40 <br />90 <br />4' SANITARY MANHOLE (10'-12') <br />LF <br />3: <br />$4,861.63 <br />$14,584.89 <br />$1;458.49 <br />90 <br />8" CONNECT TO EXISTING MANHOLE <br />EA <br />1 <br />$3,500.32 <br />$3,500.32 <br />$350.03 <br />90 <br />6' SANITARY SERVICE <br />LF <br />420 <br />$13.07 <br />$5,489.40 <br />$548.94 <br />90 <br />6" CLEANOUT <br />EA <br />3 <br />$375.00. _ <br />..$1,125.00 <br />$112.50 <br />90 <br />SUBTOTAL SANITARY <br />$94,830.66 <br />$9;48$.07 <br />U 11�CD 5 <br />q ► (a <br />"All <br />A\ 1 1 L) <br />� I <br />ArACIAMENT 131 <br />