DRAINAGE 1
<br />UNIT
<br />QUANTITY
<br />UNIT COST
<br />TOTAL COST
<br />INCOMPLETE
<br />% COMPLETE
<br />6" HDPE STORM PIPE -PERFORATED
<br />LF
<br />517
<br />$12.20
<br />$6,307.40
<br />$6,307.40
<br />0
<br />12" HDPE STORM PIPE
<br />LF
<br />148
<br />$18,10
<br />$2,678,80
<br />$267.88
<br />90
<br />15" HDPE STORM PIPE
<br />LF
<br />23
<br />$22.50
<br />$517.50
<br />$51.75
<br />90
<br />18" HDPE STORM PIPE
<br />LF
<br />340
<br />$27.91
<br />$9,489.40
<br />$948.94
<br />90
<br />24" HDPE STORM PIPE
<br />LF
<br />1,215
<br />$40.70
<br />$49,450.50
<br />$4,945.05
<br />90
<br />36" HDPE STORM PIPE
<br />LF
<br />748
<br />$63.50
<br />$47,498:00
<br />$4,749.80
<br />90
<br />EDOTTYPE C INLET
<br />EA
<br />6
<br />$1,946:16
<br />$11,676:96
<br />$1,167:70
<br />90
<br />WT TYPE D INLET
<br />EA
<br />3
<br />$2,587.68
<br />$7,763.04
<br />$776.30
<br />90
<br />FDOTTYP.E9INLET
<br />EA
<br />25
<br />$2,581:26
<br />$64,531.50
<br />$6,453:15
<br />90
<br />STORM MANHOLE
<br />EA
<br />5
<br />$2,581.26
<br />$12,906.30
<br />$1,290.63
<br />90
<br />SUBTOTAL DRAINAGE
<br />$212,819.40
<br />$26;958.60
<br />87 111 C �nS
<br />C 3/04
<br />LIGHT & HEAVY DUTY ASPHALT
<br />UNIT
<br />QUANTITY .
<br />_ UNIT COST
<br />TOTAL COST
<br />INCOMPLETE
<br />% COMPLETE
<br />3/4" TYPE S3 ASPHALT BASE COURSE
<br />SY
<br />6,098
<br />$5.25
<br />$32,014.50
<br />$3;201.45
<br />90
<br />3/4." TYPE S3 ASPHALT -SURFACE COURSE
<br />SY
<br />6,098
<br />$5.25
<br />$32;014.50
<br />$32,014.50
<br />0
<br />1.1/4" TYPE S3 ASPHALT SURFACE COURSE
<br />SY
<br />2;108
<br />$9.00
<br />$18,972.00
<br />$18;972.00
<br />-
<br />TYPEFCURB
<br />LF
<br />2,324
<br />$11.10
<br />$25,796:40
<br />$2,579:64
<br />90
<br />TYPE DCURB
<br />LF
<br />709
<br />$10.00
<br />$7;090:00
<br />$709.00
<br />90
<br />WHEELSTOPS
<br />EA
<br />55
<br />$200.00
<br />$11,000.00
<br />.$11,000.00
<br />0
<br />DUMPSTER PAD
<br />SY
<br />105
<br />$40.00
<br />$4,200.00
<br />$4;200.60
<br />0
<br />SIDEWALK
<br />LF
<br />.1,600
<br />$5.50
<br />$8,800.00
<br />$8,800.00
<br />0
<br />STRIPING AND SINAGE
<br />LS
<br />1
<br />$11,300.00
<br />$11,300.00
<br />$11,300.00
<br />0
<br />SUBTOTAL LIGHT & HEAVY DUTY ASPHALT
<br />$151,187.40
<br />$92,776.59
<br />39 _
<br />C3'QIIt
<br />WESTERN BUFFER • U141T QUANTITY UNIT COST
<br />LIVE OAK
<br />BALD CYPRESS
<br />CABBAGE PALM
<br />SEA GRAPE
<br />UGUSTRUM TREE
<br />WAX MYRTLE
<br />PODOCARPUS
<br />AWABUKI VIBUMUM
<br />WALTER'S VIBUMUM
<br />GULF MUHLYGRASS
<br />DWARF FAKAHATCHEE
<br />SOD
<br />SUBTOTAL EROSION CONTROL
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />EA
<br />SF
<br />31
<br />14
<br />6
<br />33
<br />19
<br />65
<br />30
<br />185
<br />43
<br />59
<br />344
<br />$305.00
<br />$100.00
<br />$115.00
<br />$190.00
<br />$130.00
<br />$55.00
<br />$118.00
<br />$6.50
<br />$6.50
<br />$6.50
<br />ATTACHMENT
<br />$4,270:00
<br />$600.00
<br />$3,795.00
<br />$3,610.00
<br />$8,450.00
<br />$1,650.00
<br />$21,830.00
<br />$279.50
<br />$383.50
<br />$2,236.00
<br />$4,581.40
<br />$58,505:40
<br />$4,270.00
<br />$600.00
<br />$3,795.00
<br />$3,610.00
<br />$8,450.00
<br />$1,650.00
<br />$21,830.00
<br />$279.50
<br />$383:50
<br />$2,236.00
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0/
<br />o y,, �1
<br />0 e\p_;M
<br />3
<br />132
<br />
|