Laserfiche WebLink
the overall magnitude of the project and the alongshore distribution of the fill templates will be considered. <br />Avoiding hairdbottom impacts will expedite the permitting process and reduce the needed for mitigation. <br />Storm protection benefits afforded by the project will be evaluated by using the SBEACH model. The <br />calibrated SBEACH model setup from analyzes performed as part of the 2014 update to the County's <br />Beach Preservation Plan will be utilized. Numerical modeling (i.e. Delft3D) in not included in this <br />proposal. If numerical modeling is deemed necessary in evaluating the project and CB&I's services are <br />requested, i separate work order will be proposed to the County. <br />A feasibilityi analysis will be performed to evaluate potential upland sand borrow sources to be utilized for <br />fill material. The analysis will evaluate various upland sand sources to identify the most economical and <br />cost effective option. The upland sand sources, including those utilized for construction of the initial <br />Sector 3 Beach Restoration Project and the Sector 3 Dune Repair Project, will be considered as they <br />have been previously approved by the FDEP for grain size, color, and carbonate content. <br />The presence of hardbottom resources and the minimization of impacts will likely limit the volume of sand <br />that can be placed to construct the project. As a result, it is not anticipated that the size of the project will <br />facilitate the use of offshore borrow areas. If offshore borrow areas are deemed viable and CB&I's <br />services are requested in evaluating the borrow areas, a separate work order will be proposed to the <br />County. Additional services not included in this scope of work may include, but are not limited to, <br />reviewing areas previously identified and permitted by the County to determine the volume of beach <br />compatibleisand available and their future viability, development of permit sketches, collect bathymetric <br />surveys, and perform geotechnical investigations. <br />The fill volt mes and upland sand borrow sources will be used to estimate construction costs and <br />durations. The construction timeline will consider sea turtle nesting season and expected permit <br />conditions. <br />Deliverables <br />CB&I will provide the County an electronic copy of the draft feasibility report for the County's review and <br />comments. One (1) hard copy and one (1) electronic copy of the final feasibility report will be provided. <br />Schedule <br />The design' and evaluation of the potential options for Sector 5 project area will begin upon receipt of a <br />notice -to -proceed. It is anticipated that 60 days will be required to complete the analysis and compose <br />a feasibility report documenting the findings. At such time, a draft report will be provided to the County <br />for its review and comments. Once the comments are returned to CB&I, the, final report addressing the <br />comments will be submitted to the County within 15 days. <br />Cost <br />The cost to analyze the project area and compose a feasibility report is $32,248.00. A breakdown of the <br />hours and expenses to develop these costs is attached and follow the terms of CB&I's agreement with <br />Indian River County. <br />196 <br />