Laserfiche WebLink
WORK PLAN <br />Proiect Timeline: <br />The project timeline below indicates the estimated start and end date of the project as well as the <br />dates of key activities and milestones. No work shall be performed prior to the date on a fully <br />executed agreement, and No construction shall be started prior to the Division's approval of <br />the mitigation improvements. The completion of the tasks below will ensure that the project <br />meets the projected due dates. <br />Proiect Start: Date indicated on fully executed agreement. <br />Task 1: Identification and Inspection- Following receipt of an executed agreement, the County will <br />first rev ew the existing SHIP waiting list for viable residential homes to address. Homes must be <br />located within the boundaries of Indian River County, cor,t1crketet prior to March 1, 2002 and will be <br />limited to $200,000 assesses value. The County will beginmarket:Og�and outreach efforts for <br />Applicant recruitment. New Applicants will be pre-screened" for program;requirements, and <br />application packages will be completed for eligible homeowners. Prior,to i•nsspection, attempts will be <br />made to obtain a list of mitigation features to reduce the insurance premium from the homeowner's <br />insurance company. Initial inspections of identified homes will occur, and identification of possible <br />mitigation improvements and or mitigation deficiencies. The inspector shall determine whether the <br />residential structure can be retrofitted to effectively{irnpjove resistance to dama'ge:�,Days to <br />complete: Up to twenty-five (25) days `t=�;. .' 4,3:' tF , <br />� Y�.3r s; x,. <br />Task 2: Submission of Identified Propetrerties., PrLoperty Infos caution Sheet (PIS) compiling <br />information requested for each residentia p opertyryidentified :four.;"pssible mitigation retrofits will be <br />completed. Included is information on each residence identifY in 9 t gwhether the residence is site built, <br />,� <br />if any uripermitted work has.occurred at the residence whether it istllthe homeowner's primary <br />residence, if any outstandi%igkliensor judgments exist ornEthe property;and color photographs of the <br />property,. Days to co pallvete`: up to SkfollowingtTgas x , X `-'40;k:,,,_ <br />;-::-A-+!� `•- i J fi t/ <br />Deliverable 1- Submit,=yin an electronic formatthe completed Initial Property Information <br />Spreadsheet (PIS). All'tke,tequested_informationOdentified by the PIS is required and shall be <br />provided.,including multipte1/44`r)photagraphs provided in digital format. Initial PIS due within <br />thirt;3:0; da"sof_the final coiit act exec utibn daterAny additional or deleted properties are due <br />5 2017. -4% r�:- <br />by April l` u ?° � 742 <br />Task 3: Scopeof Work Development-` S -cope of Work (SOW) shall be developed for each property <br />approved bnZthe Division, based:ion the i litigation measures identified in the PIS and approved by <br />the Division. If required by the'Bailding Official, certified drawings will be developed for mitigation <br />improvements and approved by a;State of Florida Registered Professional Engineer or Florida <br />Registered Architectas: required. EI`k. n accordance with the County's procurement policies and procedures, a <br />Qualified, Licensed Flo�'ida-Contracto will be hired to complete the SOW for each Division approved <br />residential structure, detailed fur'the'r in V: Cost Control. Days to complete: 45-60 days following <br />au•::a <br />approvall of PIS by the Divi"s on <br />V <br />Deliverable 2- Submit, in an electronic format, within fourteen (14) days of contractor <br />selection, a spreadsheet that contains the following information: <br />1. RCMP Project Number; <br />2. Date of Report; <br />3. Property Owner's Name; <br />4. Selected Contractor's Name and date of Contractor selection for each mitigation <br />measure; and, <br />5. Florida Product Approval Code for each mitigation product to be installed. <br />12 <br />112 <br />