Laserfiche WebLink
,r49. <br />INDIAN RIVER COUNTY <br />DEPARTMENT OF UTILITY SERVICES <br />INTEROFFICE MEMORANDUM <br />DATE: <br />TO. <br />FROM: <br />PREPARE <br />SUBJECT: <br />BY: <br />March 30, 2016 <br />Jennifer Hyde, Manager, Purchasing Division <br />Vincent Burke, P.E., Director of Utility Services 61) <br />Arjuna Weragoda, P.E., Capital Projects Manager AO <br />Bid Award Recommendation for the North RO Membrane Replacement <br />IRC Bid No.: 2016025 <br />UCP No.: N/A WIP No.: <br />47123536-044699- <br />16508 <br />On Monday, February 29`h, 2016, two (2) Bids were received and opened at 2:00 PM for the above referenced <br />project, as follows: <br />The County's Consulting Engineer, Kimley Horn and Associates (KHA), Inc., has reviewed the bids and has <br />recommended that the bid be awarded to the second lowest responsive, responsible bidder, Harn R/O Systems, <br />Inc., for Total Bid Price in the amount of $1,041,629.00 which includes the add alternates. The Purchasing <br />Manager emailed Aerex Industries, Inc., on March 18, 2016 that their bid was non-responsive and ineligible <br />for consideration given that the Bid Form was not signed nor the total base bid price in words filled out. <br />Therefore, this left the second lowest bidder Harn R/O Systems, Inc., as the only consideration. Although, <br />the membrane replacements were part of the five year Capital Improvement Program (CIP), the <br />Department has delayed the replacement for other projects. Given that the existing membrane <br />efficiencies have declined and the need to replace these membranes have become urgent it is the opinion <br />of staff to award the contract to the second lowestrresponsive, responsible bidder without any further delays. <br />The add -alternate is to replace the aging first stage membranes in skids 5 and 8. Please find attached the <br />recommendation of Award letter from KHA as a reference. The second lowest, responsive, responsible base bid <br />price is approximately 27% higher than the engineers estimate. It is our opinion the bid prices even the lowest <br />bid price 'came higher than the engineer's estimate because the second membrane manufacturer Hydranautics <br />did not provide pricing to the OEM's. <br />The Department of Utility Services acknowledges and accepts KHA's recommendation and request to award the <br />bid in the amount of $1,041,629.00 to Harn R/O Systems, Inc. <br />If you have any questions, please call Arjuna Weragoda at Ext. 1821. <br />Cc: <br />'Cindy Corrente, Finance Manager, Utilities ccorrente@ircgov.com <br />Terry Southard, Manager of Operations, Utilities tsouthard@ircgov.com <br />Page 1 <br />F:Wtlities\Llf1LFTY - Emoinc,ing\WATER \ iC Mernt ancaVtdmin\BID. RECOMMENDATION Memo to PURCHASING Membranes N.RO.doc <br />39 <br />Bidder(s) <br />City/State <br />Total Base Bid Price <br />Total Bid Price <br />w/Alternate <br />1. <br />Aerex Industries, Inc. <br />Ft. Pierce, FL <br />$682,971.00 <br />$964,101.00 <br />2. <br />Harn R/O Systems, Inc. <br />Venice, FL <br />$776,872.00 <br />$1,041,629.00 <br />The County's Consulting Engineer, Kimley Horn and Associates (KHA), Inc., has reviewed the bids and has <br />recommended that the bid be awarded to the second lowest responsive, responsible bidder, Harn R/O Systems, <br />Inc., for Total Bid Price in the amount of $1,041,629.00 which includes the add alternates. The Purchasing <br />Manager emailed Aerex Industries, Inc., on March 18, 2016 that their bid was non-responsive and ineligible <br />for consideration given that the Bid Form was not signed nor the total base bid price in words filled out. <br />Therefore, this left the second lowest bidder Harn R/O Systems, Inc., as the only consideration. Although, <br />the membrane replacements were part of the five year Capital Improvement Program (CIP), the <br />Department has delayed the replacement for other projects. Given that the existing membrane <br />efficiencies have declined and the need to replace these membranes have become urgent it is the opinion <br />of staff to award the contract to the second lowestrresponsive, responsible bidder without any further delays. <br />The add -alternate is to replace the aging first stage membranes in skids 5 and 8. Please find attached the <br />recommendation of Award letter from KHA as a reference. The second lowest, responsive, responsible base bid <br />price is approximately 27% higher than the engineers estimate. It is our opinion the bid prices even the lowest <br />bid price 'came higher than the engineer's estimate because the second membrane manufacturer Hydranautics <br />did not provide pricing to the OEM's. <br />The Department of Utility Services acknowledges and accepts KHA's recommendation and request to award the <br />bid in the amount of $1,041,629.00 to Harn R/O Systems, Inc. <br />If you have any questions, please call Arjuna Weragoda at Ext. 1821. <br />Cc: <br />'Cindy Corrente, Finance Manager, Utilities ccorrente@ircgov.com <br />Terry Southard, Manager of Operations, Utilities tsouthard@ircgov.com <br />Page 1 <br />F:Wtlities\Llf1LFTY - Emoinc,ing\WATER \ iC Mernt ancaVtdmin\BID. RECOMMENDATION Memo to PURCHASING Membranes N.RO.doc <br />39 <br />