Laserfiche WebLink
ATKINS <br />Proposal to Provide <br />Professional Engineering Services <br />for <br />IRC Project No. 1305 — CR 512 Resurfacing and Shoulder Widening Project <br />Myrtle Street to 125th Avenue <br />Fellsmere, Indian River County, Florida <br />Indian River County (County) is proposing to improve the safety and operation of CR 512 (Pennsylvania <br />Ave./Fellsmere Rd) from Myrtle Street to 125th Avenue in Fellsmere, Indian River County, Florida. The <br />proposed improvements will consist of constructing new 2 ft. wide shoulder widening to the existing 3 ft. <br />wide shoulder to provide a paved 5 ft. wide shoulder, repairing the existing shoulder base as needed, milling <br />and resurfacing the existing pavement, repairing existing sidewalks, rehabilitating existing crosswalks, <br />upgrades to existing traffic signal equipment at three locations, relocating an existing school zone flasher, <br />review/relocation of existing signage, new signage as needed and thermoplastic pavement markings. The <br />length of roadway within the project area is approximately 8,500 LF. <br />At the request of the County, ATKINS (Consultant) has prepared a scope of services for providing <br />engineering design and construction documents for the proposed roadway improvements as follows: <br />SECTION 1 SCOPE OF SERVICES <br />TASK 1: EXISTING CONDITIONS REVIEW <br />Atkins will review the existing survey of the roadway area provided by the County and make a site visit to <br />review the project area. This task also includes meeting with County Staff to review the project and discuss <br />areas of particular concern. <br />TASK <br />2: ROADWAY PLANS <br />1. Based on review of the information obtained in Tasks 1, the Consultant will prepare design and <br />construction documents for the proposed improvements. The construction documents will be <br />prepared in 22 inch x 34 inch format and will include the following drawing sheets: <br />Exhibit "A" <br />• Cover Sheet, <br />• Typical Section, <br />• Quantities Summary, <br />• Roadway Plan, <br />• Cross Sections, <br />• Stormwater Pollution Prevention Plan, <br />• Selective Clearing and Grubbing, <br />• Signing and Pavement Marking Plan, <br />• Construction Details <br />• Signalization Plans (Task 3) <br />Page 1 of 10 <br />March 23, 2016 <br />57 <br />