Laserfiche WebLink
ATKINS <br />The construction plans will be based on the survey provided by the County in electronic format <br />(pdf and AutoCAD .dwg file) and will show the following: <br />a. Construction of new shoulder pavement, <br />b. Repairing the existing shoulder base as needed, <br />c. Milling and resurfacing the existing pavement, including cross slope correction if needed, <br />d. Repairing existing sidewalks, <br />e. Rehabilitating existing pedestrian crosswalks to meet current FDOT/ADA design <br />standards, <br />f. Removal of the existing mid -block crosswalk at Magnolia Street, <br />g. Sidewalk with pedestrian crossing per FDOT/ADA requirements at Willow Street, <br />h. Relocation of the existing east bound school zone flasher, <br />i. Relocation and/or replacement of existing signage, <br />j. New thermoplastic pavement markings. <br />k. Cross sections will be provided at 100 ft intervals. <br />1. Signalization Plans (Task 3). - <br />Plans will be submitted to the County for review at the 30%, 75% and 100% design stages. <br />2. Prepare two (2) estimates of probable construction costs based on 75% and 100% Construction <br />Documents (CD's). The area of any easements or right of way required for construction of the <br />proposed improvements will be calculated but no dollar value will be assigned. <br />3. Provide technical specifications for the project. The technical specifications will be based on an <br />approved current edition provided by the County. Specifications shall be submitted to the County <br />for review with the 75% and 100% design submittal. <br />4. This task includes 3 meetings with County staff to review the roadway and signalization design. <br />5. For each review submittal to the County the Consultant will provide three sets of plans and <br />calculations, an electronic PDF copy of each submittal will also be provided. <br />TASK 3: SIGNALIZATION PLANS <br />The following traffic signal, pedestrian crossing and school zone upgrades are proposed by the County: <br />1. <br />2. <br />3. <br />CR -512 and Willow Street: The existing span wire signal will be replaced with a new mast arm, <br />signal equipment and new video signal controls per Indian River County requirements. The <br />locations of the mast arms and signal controls will be coordinated with FPL. <br />CR -512 and Broadway Street: The existing beacon will be replaced, including the service box. <br />The existing span wire signal poles and span wires will also be replaced. <br />CR -512 and Cypress Street: The existing beacon will be replaced, including the service box. <br />The existing span wire signal poles and span wires will also be replaced. The existing mid -block <br />crosswalk at this location will be upgraded to the latest FDOT pavement marking and signage <br />standards. Additionally, if the sidewalk ramps are impacted by the proposed project, they will be <br />replaced and upgraded to the latest standards. The location of the existing sidewalk on CR -512 at <br />the intersection may need to be relocated to accommodate the proposed improvements. <br />Page 2 of 10 <br />March 23, 2016 <br />58 <br />