4. <br />5. <br />ATKINS <br />CR -512 and Magnolia Street: There is an existing mid -block crosswalk at this location. This <br />crosswalk and all associated signage will be removed. The crosswalk will not be reinstalled at this <br />location. These improvements will be shown on the roadway plan (Task 2). <br />CR -512 Existing School Zone Flasher: Due to the removal of the mid -block crosswalk at <br />Magnolia Street, the existing school flasher (location and existing equipment) will be relocated. <br />These improvements will be shown on the roadway plan (Task 2). <br />The services to be performed under this task are as follows: <br />1. Traffic Signal Concept Plan: <br />Based on the survey provided by the County, the Consultant will develop a base map and Traffic Signal <br />Concept plan of the signal locations for the traffic signal location. The signal design team will verify and <br />supplement the survey data by field measurements, and set up the base mapping files in order to conduct <br />the signal design. The level of effort assumed for this task includes one site visit. <br />2. Subsurface Utility Excavation (SUE): <br />Atkins will retain the services of a qualified professional to provide SUE at the four (4) proposed mast arm <br />locations. A maximum of 20 test holes will be performed to clear the foundation locations of utilities. The <br />proposed foundation locations will be provided to the SUE contractor by ATKINS based on the Traffic <br />Signal Concept Plan approved by the County. Based on information obtained from the test hole excavation, <br />the SUE contractor will provide a utility location plan sheet documenting the apparent utility type and <br />observed location, depth and size uncovered in this investigation. This information will be used in the <br />design phase to minimize or avoid utility relocations. The utility location plan sheet will be forwarded to <br />the County for their information regarding any utilities that require relocation. <br />3. Traffic Signal Design: <br />The Consultant will prepare and submit a Traffic Signal Concept Plan with the 30% Roadway plan <br />submittal. Based on review and approval of the Traffic Signal Concept Plan the Consultant will develop <br />signal design plans prepared in accordance with the County standards and preferences, the Florida <br />Department of Transportation (FDOT) standards and the Manual on Uniform Traffic Control Devices <br />(MUTCD). Locations of signal equipment and power source will be coordinated with FPL. <br />The signal design plans will be prepared in 11 inch x 17 inch format and will include the following sheets: <br />• Tabulation of quantities sheet, <br />• General notes sheet, <br />• Signalization plan sheets, <br />• Utility location plan sheets, <br />• Mast arm tabulation, <br />• Detail sheets <br />The plans will be submitted to the County at the 75% and 100% phases for review and comment. Review <br />comments received from the County will be incorporated into the plans and written responses to the <br />comments will be provided. This task includes one meeting with the County to review comments on the <br />75% plan submittal. Following review of County's comments the Consultant will revise the traffic signal <br />plans and provide a written response to each comment. Final 100% Traffic Signal plans signed and sealed <br />plans will then be submitted to the County for approval. <br />The following detail the proposed traffic signal improvements: <br />March 23, 2016 <br />Page 3 of 10 <br />59 <br />