Laserfiche WebLink
ATKINS <br />Intersection of CR 512 at Willow Street: <br />The traffic signal design will incorporate a mast arm pole design layout in accordance with FDOT mast <br />arm standards and County's preferred signal configuration for the intersection of CR 512 at Willow Street. <br />The design will feature LED signal heads, video detection, and overhead street name signs in accordance <br />with FDOT approved materials. <br />Intersections of CR 512 and Broadway Street and CR 512 at Cypress Street: <br />Based on information provided by the County it is assumed that the existing signal poles and span wire <br />system will require replacement, including replacement of the flashing beacon signal heads and wiring. <br />Relocation of existing ITS pull boxes and connect proposed signal at Willow Street to ITS system.: <br />Based on existing pull box locations provided by the County the Consultant will show re -located pull box <br />locations along CR 512 on the construction drawings and connection of the proposed new traffic signal at <br />Willow Street to the ITS system. It is assumed there is sufficient slack in the existing pull box for the <br />relocation. <br />4. Structural Review: <br />Intersection of CR 512 at Willow Street: <br />The Corisultant will review the Project Geotechnical Investigation Report (provided by the County) of the <br />proposed mast arm locations. The report will be based on the Traffic Signal Concept Plan provided to the <br />Countyby the Consultant. The report shall provide geotechnical boring information for all four mast arm <br />pole locations at the intersection of CR 512 and Willow Street. <br />Based on review of the Project Geotechnical report, the Consultant will provide a structural evaluation of <br />the geotechnical findings to determine if FDOT standard signal poles and foundations can be used. If the <br />finding are outside the standard guidelines then a more extensive structural design for the poles and <br />foundations will be necessary (not included within this scope of work and fee proposal). <br />TASK 3A: STRAIN POLE DESIGN <br />1. Strain Pole Design: <br />Intersections of CR 512 and Broadway Street and CR 512 at Cypress Street: <br />The Consultant will review the Project Geotechnical Investigation Report (provided by the County) of the <br />proposed signal pole locations. The report will be based on the Traffic Signal Concept Plan provided to <br />the County by the Consultant. The report shall provide geotechnical boring information for all signal pole <br />locations at the Broadway Street and Cypress Street intersections. <br />The Consultant will provide the structural analysis in order to design the two strain poles at each <br />intersection. This analysis will include designing the poles and foundations and identifying the <br />appropriate poles at each location. <br />2. Subsurface Utility Excavation (SUE): <br />Atkins will retain the services of a qualified professional to provide SUE at the four (4) proposed signal <br />pole locations. A maximum of 20 test holes will be performed to clear the foundation locations of utilities. <br />The proposed foundation locations will be provided to the SUE contractor by ATKINS based on the Traffic <br />Signal Concept Plan approved by the County. Based on information obtained from the test hole excavation, <br />the SUE contractor will provide a utility location plan sheet documenting the apparent utility type and <br />observed location, depth and size uncovered in this investigation. This information will be used in the <br />design phase to minimize or avoid utility relocations. The utility location plan sheet will be forwarded to <br />the County for their information regarding any utilities that require relocation. <br />March 23, 2016 <br />Page 4 of 10 <br />60 <br />