My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/19/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
04/19/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 11:38:18 AM
Creation date
6/30/2016 11:57:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/19/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK <br />4: PERMITTING AND UTILITY NOTIFICATION <br />ATKINS <br />The Consultant will prepare and submit permit applications with accompanying Construction Documents <br />for agency review, coordinating each submittal with the Client as necessary. The following permitting <br />activities are anticipated: <br />Indian River County Public Works staff review: <br />The Consultant will prepare and submit to County Public Works submittal packages with accompanying <br />Construction Documents (plans and specifications), and the Engineers Estimate of Probable Construction <br />Cost in support of obtaining Public Works Approval for the proposed improvements. The submittals will <br />occur at the 30%, 75% Design and 100% Construction Documents phase. Comments from the 30% and <br />75% plan submittal will be incorporated into the 100% Construction Document Plan set for approval by the <br />County and the Consultant will provide a written response to each comment. This task includes one meeting <br />with the County to review comments. <br />St. Johns River Water Management District (SJRWMD) Permit Exemption Request: <br />The Consultant shall prepare and submit a request for permit exemption for the proposed improvements. <br />It is assumed that this project will qualify for an exemption under F.A.C: Chapter 62-330.05 Exempt <br />Activities (c) Minor roadway safety construction, alteration, or maintenance and operation. <br />Utility Notification and Coordination: <br />The Consultant will coordinate with local utility providers including FP&L, AT&T, Bright House <br />Networks, NUI City Gas Company, County and Town Utility department to obtain available information <br />regarding existing utilities within the proposed project limits. This task includes review and coordination <br />of proposed FPL poles within the project area with the proposed improvements, including new traffic signal <br />poles. The Consultant will provide a Notice to Utility Owner Providers of the proposed improvements. <br />Upon request by the County a record of notification to each utility provider will be provided to the County. <br />This record will either consist of an email confirming electronic delivery, certified mail, or fedx/ups <br />delivery record. This task includes one utility coordination meeting during the design phase to review <br />utility conflicts that have been identified by the utility provider or determined during the design phase. <br />TASK <br />5: BID PHASE SERVICES <br />Following approval of the 100% Construction Documents for the roadway plans and traffic signal <br />improvement by the County, the Consultant will prepare bid documents to the County consisting of the <br />approved construction drawings and the project technical specifications issued for bid. The Consultant will <br />also edit Division 0 and 1 specifications provided by the County in MS Word format to insert project <br />specificinformation in these sections, including the bid schedule. It is assumed that only minor project <br />specific information editing of Division 0 and 1 specifications will be required. The Consultant will also: <br />1. Attend a pre-bid meeting, <br />2. Prepare answers to questions submitted by potential bidders to the County (7 calendar day review <br />period). Estimated level of effort is based on providing one combined response of all questions <br />submitted to and compiled by the County. <br />3. Assist the County with preparing bid addendums for technical items (one bid addenda is assumed). <br />4. Review and make recommendations to County regarding acceptance of the low bid contractor's <br />Schedule of Values. <br />Following bid submittal, the Consultant will review the submitted bids and provide a recommendation for <br />award to the County. <br />March 23, 2016 <br />Page 5 of 10 <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.