My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/19/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
04/19/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 11:38:18 AM
Creation date
6/30/2016 11:57:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/19/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />SECTION 2 ASSUMPTIONS AND EXCLUSIONS <br />1. Application fees, impact fees and any other fees required by regulatory agencies are considered a direct <br />expense to the County. <br />2. The following assumptions apply to this scope of services: <br />• The site does not contain hazardous materials. <br />• The existing shoulder construction matches the existing roadway pavement section. <br />• Sidewalk repair is limited to replacement of damaged sections. <br />• Sidewalk replacement is limited to minor alignment adjustments to meet current ADA <br />requirements including upgrades at pedestrian crossings. <br />• The proposed facilities will not require relocation of major utility facilities, including power, <br />communications, water, sewer and gas. Design and permitting of major utility relocation is <br />assumed to be by the utility provider and is not included in this proposal. <br />• Drainage, grading and utility adjustment information will be located on the roadway plan <br />sheets. <br />• The Contractor will be responsible for preparation and submittal of a Maintenance of Traffic <br />(MOT) Plan to the County for approval prior to construction. No MOT details will be included <br />in the Construction Plans. <br />• The Contractor will be responsible for preparation and submittal of the FDEP NOI for the <br />project prior to construction and N.O.T upon completion of construction. <br />• The Contractor shall provide an as -built survey, prepared by a land surveyor registered in the <br />State of Florida, to the County and Atkins. <br />• Task 5 Bid Phase services is assumed to last approximately two months from submittal of Issue <br />for Bid documents to the County. <br />3. Design and permitting of any offsite improvements, other than those identified herein, are not included <br />in this proposal. <br />4. FDOT standard structures will be specified for all proposed drainage structures. The structural design <br />of special structures that may be required to address special design conditions or conflicts is not <br />included in this scope. <br />5. The following items are not included in this scope of work: <br />• Traffic Signal Warrant studies. <br />• Traffic Planning and traffic studies. <br />• ITS design. <br />• Geotechnical Investigations. <br />• Profile Drawings of the proposed improvements. <br />March 23, 2016 <br />Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.