My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-103
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 10:15:38 AM
Creation date
7/14/2016 10:15:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Scope of Services
Approved Date
07/12/2016
Control Number
2016-103
Agenda Item Number
8.E.
Entity Name
Carollo Engineers
Subject
Brick Manhole Rehabilitiation Project
Work Order No.1
Area
Ixora Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> W. O. NO. 1 <br /> BRICK MANHOLE REHABILITATION PROJECT <br /> PURPOSE <br /> The purpose of this Task Order is to describe the Scope of Services for the Brick Manhole <br /> Rehabilitation Project. <br /> The overall goal of the project is successfully rehabilitate brick manholes using a structural <br /> epoxy coating system as an alternative to installation of a FRP liner system. An FRP liner <br /> system requires that the cone section be removed and replaced causing significant public <br /> disruption and added expense to the OWNER. The OWNER has selected six (6) of their worst <br /> brick manholes for this project located within the Ixora Park Subdivision. This task order <br /> includes the development of performance specifications, application services/inspection/quality <br /> control testing of the rehabilitated manholes, and a brief summary technical memorandum. <br /> ENGINEER'S SERVICES <br /> ENGINEER's services include the following three tasks to complete this assignment. These <br /> tasks are discussed in detail below. <br /> • Task 1 - Performance Specification Development <br /> • Task 2 - Application Services/Inspection/Quality Control Testing <br /> • Task 3 - Technical Memorandum <br /> TASK 1. PERFORMANCE SPECIFICATION DEVELOPMENT <br /> ENGINEER will develop a performance_specification to cover the brick manhole rehabilitation <br /> utilizing a structural epoxy coating system. <br /> Deliverables by ENGINEER for OWNER review and input: <br /> • Performance specification <br /> TASK 2. APPLICATION SERVICES/INSPECTION/QUALITY CONTROL <br /> Subtask 2.1. Application Services <br /> ENGINEER has selected the application of the structural epoxy coating system based on prior <br /> successful experience rehabilitating brick manholes. ENGINEER will coordinate the application <br /> services to perform the rehabilitation of the six (6) brick 48-inch diameter manholes. The <br /> manhole locations and depth are listed below: <br /> 2534 2nd Street 10'-5" <br /> Lift Station 100 12' <br /> 2464 1st Place 9' <br /> 2184 1st Place 7' _ <br /> H-\Client\Indian River County\Contract\IRC 2016-TO2_doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.