My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-103
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 10:15:38 AM
Creation date
7/14/2016 10:15:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Scope of Services
Approved Date
07/12/2016
Control Number
2016-103
Agenda Item Number
8.E.
Entity Name
Carollo Engineers
Subject
Brick Manhole Rehabilitiation Project
Work Order No.1
Area
Ixora Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2413 2nd Street SW 8' <br /> 2413 2nd PI SW 6' <br /> Owner will be responsible for any permits and debris removal that may be required No permits <br /> are anticipated, since all work will be performed through the open manhole lid <br /> Subtask 2.2. Inspection <br /> i <br /> ENGINEER will perform limited on-site field inspection and train County inspectors on the steps <br /> involved with the successful rehabilitation of brick manholes Assume three days <br /> Subtask 2.3. Quality Control <br /> ENGINEER will observe two quality control tests during subtask 2.2 The first is a spark testing <br /> of the finished surface of each manhole to ensure that no pinholes exist. The second is <br /> adhesion tests of two of the six manholes to ensure that the minimum adhesion test requirement <br /> has been achieved. The test will be extended to failure to access the maximum adhesion that <br /> was achieved. Costs associated with this task are included in subtask 2.2 <br /> TASK 3. TECHNICAL MEMORANDUM <br /> Subtask 3.1. Draft Technical Memorandum <br /> At the completion of the manhole rehabilitation (Tasks 1 and 2), ENGINEER will produce a brief <br /> draft technical memorandum (TM) summarizing the results of the project and distribute the TM <br /> to OWNER for review and approval <br /> Subtask 3.3. Final Technical Memorandum <br /> The ENGINEER will revise the draft TM as appropriate based on the OWNER's comments <br /> received, and submit a Final TM. <br /> Task 3 Deliverables: <br /> Draft brief TM (PDF) <br /> Final TM (PDF) <br /> TIME OF PERFORMANCE <br /> Completion of the services outlined above will be provided over the course of three months after <br /> notice to proceed. <br /> PAYMENT <br /> OWNER shall pay ENGINEER for ENGINEER's Services, as delineated above, rendered under <br /> a lump sum fee of $47,200 (Task 1- $3,125, Task 2.1- $32,175, Task 2.2- $9,260, Task 3- <br /> $2,640). <br /> HAClient\Indian River County\Contract\IRC 2016-TO2_doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.