My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-096
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 10:12:45 AM
Creation date
8/8/2016 10:02:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/21/2016
Control Number
2016-096
Agenda Item Number
8.D.
Entity Name
Florida Department of Transportation
Subject
Construction of sidewalk and drainage modifications
Area
North side of 8th St. from 58th Ave. to 21st. Cout
Document Relationships
2016-055
(Attachment)
Path:
\Resolutions\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
525-010-44 <br /> PROGRAM MANGEMENT <br /> 08115 <br /> Page 6 o16 <br /> Requirement Reference Local Agency Responsibilities District Monitoring Requirement Location <br /> Responsibilities <br /> 39 Warranty Clauses 23 CFR 635 413 Warranty provisions shall be for a specific construction product or Review bid document for warranty Appendix D, Page 44,GC54 <br /> feature. Items of maintenance are not eligible for federal projects clauses. Remove all general <br /> and shall not be covered.General condition warranties for an condition warranty clauses from <br /> entire project are not allowed.Transfer of product warranties is PS&E Package on NHS <br /> allowed. <br /> Warranty provisions on a NHS project must be approved by <br /> FHWA.Warranty provisions on the SHS must not conflict with <br /> FDOT Standard Specifications Off-system warranties may not <br /> cover maintenance. <br /> Local Agency- I hereby certify that the above mentioned LAP project construction contract documents contain the provisions set forth in this checklist. <br /> P�p.a�vv�y two v�Ti o►-J n-ip�-►la.C��.TL. <br /> Signature Position Title <br /> � '7 <br /> Name (Printed) Date <br /> District LAP Administrator/Designee. I hereby certify that the above mentioned LAP project construction contract documents contain the provisions set forth in this <br /> checklist. <br /> .cur <br /> LOC-AL t�r,06EA M A►-M i N ISIV-A-tt. <br /> Signature Position Title <br /> 4 <br /> Name(Printed) Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.