Laserfiche WebLink
1312 All supporting information requested in the Bid Form must be furnished. Do not <br /> leave any questions or requests unanswered. <br /> 13 13 Permits, Licenses, Fees and related requirements <br /> A. Contractor's requirement's- <br /> 1. <br /> equirement's1. The CONTRACTOR shall procure all permits and licenses, and give all notice <br /> necessary and incidental to the performance of the Work, including but not limited to <br /> all- <br /> - Building permit(s)for the"Primary Building Structure" and the "Exterior Shelter <br /> Structures"from all applicable jurisdictional agencies reviewing and approving <br /> the building plans (IRC Building Department, IRC Department of Health (DOH), <br /> IRC Fire Marshall/Emergency Services, and others), and all other permits issued <br /> by or through the building department that are necessary to construct the building <br /> and building systems or components, and any exterior improvements, systems, <br /> components, or infrastructure, <br /> - SWPPP permit(s): (Florida Department of Environmental Protection (FDEP), <br /> IRC), <br /> - De-watering permit(s). (St. Johns River Water Management District (SJRWMD), <br /> FDEP Industrial Wastewater, Indian River Farms Water Control District <br /> (IRFWCD), IRC); <br /> - Irrigation well permit(s)- IRC DOH, FDEP and/or SJRWMD permits and <br /> approvals for non-potable water(irrigation)well construction/drilling and water <br /> use. <br /> - Other permits and approvals customarily provided by contractor, or listed within <br /> the contract documents <br /> 2 The CONTRACTOR shall pay all jurisdictional agency inspection fees and plan <br /> review fees, and all other fees issued by or through all other applicable jurisdictional <br /> agencies reviewing and approving the building plans (IRC DOH, IRC Fire <br /> Marshall/Emergency Services, and others)that are necessary to construct the <br /> building and building systems or components, any exterior improvements, systems, <br /> components, or infrastructure, except those that may be charged by IRC Building <br /> Department or Public Works/ Engineering Department. <br /> 3 The CONTRACTOR shall provide the final building design for the "Exterior Shelter <br /> Structures", including all requisite architectural and engineering design and drawings <br /> necessary to obtain a building permit. <br /> B. Indian River County's requirements. In accordance with Florida Statutes Section 218 80, <br /> the "Public Bid Disclosure Act", Indian River County as OWNER is obligated to disclose all <br /> license, permit, impact or inspection fees that are payable to Indian River County as <br /> OWNER in connection with the construction of the Work by the accepted Bidder <br /> 1 The County will obtain/provide the following <br /> a. City of Vero Beach (COVB) Site Plan Approval— No. SP15-000014, <br /> issued 12/8/15 <br /> b Site Development permits, including: <br /> - SJRWMD— No 142891-1; issued 8/14/15 <br /> 00200-8 <br />