My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Army Corp of Engineers (ACOE)— No. SAJ-2015-02417 (NW-46), issued <br /> 8/5/15 <br /> FDEP Waste Water— No. 0039141-039-DWC-CG, issued 9/23/15 <br /> FDEP Drinking Water— No. 0080446-239-DSGP; issued 9/23/15 <br /> - COVB Utility Construction —approval issued 12/8/15 <br /> COVB Tree Removal— No TR15-000086; issued 12/8/15 <br /> IRC R-O-W— No 2015090351, issued 11/23/15 <br /> c Initial Building Plan Review for the"Primary Building Structure" and "Site <br /> work". The IRC Building Department plan review is complete and is ready <br /> for a Building permit to be issued once the building contractor submits the <br /> building permit application. <br /> - Permit Application No. 2015100221 <br /> NOTE This does not include the plan review for the "Exterior Shelter <br /> Structures" The contractor shall provide final design, engineering and <br /> architectural design and prepare and submit all requisite permit applications <br /> for these structures <br /> 2 The County will pay for- <br /> 1 All site development/impact/concurrency fees <br /> 2 COVB, Comcast, and AT&T utility connection fees and other direct expenses <br /> charged by COVB, Comcast, and AT&T for permanent utility system <br /> modifications, extensions, and connections. <br /> 3 COVB water and wastewater utility permanent connection and line extension <br /> fees charged by COVB <br /> 4 SWDD Fees (Waste). <br /> 5. IRC Building Plan Review Fee, IRC Building permit fee. <br /> 6. FGBC Commercial Building Certification review fee <br /> C. FGBC Commercial Building Certification—The County, together with the assistance of the <br /> project design team and the CONTRACTOR, will submit an application for FGBC <br /> Commercial Building Certification. The County, through its LEED coordinator, will prepare <br /> the application and submit it with supporting documentation provided by the design <br /> team and CONTRACTOR. The CONTRACTOR has a significant responsibility to ensure <br /> certification is obtained. <br /> ARTICLE 14- BASIS OF BID; EVALUATION OF BIDS <br /> 1401 Unit Price <br /> A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the <br /> Bid schedule. The site work has been itemized and listed in the Bid Form The bid items <br /> for the "Primary Building Structure" and the "Exterior Shelter Structure(s)" included on the <br /> Bid schedule are to be bid as lump sum items on the Bid Form. After receipt and opening <br /> of the bids, and within 5 days of owners request, and prior to the award of the contract, <br /> the contractor shall submit a "Schedule of Values" including each item of Work listed on <br /> the Bid Form, and the contractor shall also further itemize the Schedule of Values by <br /> allocating portions of the lump sum bid items for the "Primary Building Structure" and the <br /> 00200-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.