Laserfiche WebLink
Army Corp of Engineers (ACOE)— No. SAJ-2015-02417 (NW-46), issued <br /> 8/5/15 <br /> FDEP Waste Water— No. 0039141-039-DWC-CG, issued 9/23/15 <br /> FDEP Drinking Water— No. 0080446-239-DSGP; issued 9/23/15 <br /> - COVB Utility Construction —approval issued 12/8/15 <br /> COVB Tree Removal— No TR15-000086; issued 12/8/15 <br /> IRC R-O-W— No 2015090351, issued 11/23/15 <br /> c Initial Building Plan Review for the"Primary Building Structure" and "Site <br /> work". The IRC Building Department plan review is complete and is ready <br /> for a Building permit to be issued once the building contractor submits the <br /> building permit application. <br /> - Permit Application No. 2015100221 <br /> NOTE This does not include the plan review for the "Exterior Shelter <br /> Structures" The contractor shall provide final design, engineering and <br /> architectural design and prepare and submit all requisite permit applications <br /> for these structures <br /> 2 The County will pay for- <br /> 1 All site development/impact/concurrency fees <br /> 2 COVB, Comcast, and AT&T utility connection fees and other direct expenses <br /> charged by COVB, Comcast, and AT&T for permanent utility system <br /> modifications, extensions, and connections. <br /> 3 COVB water and wastewater utility permanent connection and line extension <br /> fees charged by COVB <br /> 4 SWDD Fees (Waste). <br /> 5. IRC Building Plan Review Fee, IRC Building permit fee. <br /> 6. FGBC Commercial Building Certification review fee <br /> C. FGBC Commercial Building Certification—The County, together with the assistance of the <br /> project design team and the CONTRACTOR, will submit an application for FGBC <br /> Commercial Building Certification. The County, through its LEED coordinator, will prepare <br /> the application and submit it with supporting documentation provided by the design <br /> team and CONTRACTOR. The CONTRACTOR has a significant responsibility to ensure <br /> certification is obtained. <br /> ARTICLE 14- BASIS OF BID; EVALUATION OF BIDS <br /> 1401 Unit Price <br /> A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the <br /> Bid schedule. The site work has been itemized and listed in the Bid Form The bid items <br /> for the "Primary Building Structure" and the "Exterior Shelter Structure(s)" included on the <br /> Bid schedule are to be bid as lump sum items on the Bid Form. After receipt and opening <br /> of the bids, and within 5 days of owners request, and prior to the award of the contract, <br /> the contractor shall submit a "Schedule of Values" including each item of Work listed on <br /> the Bid Form, and the contractor shall also further itemize the Schedule of Values by <br /> allocating portions of the lump sum bid items for the "Primary Building Structure" and the <br /> 00200-9 <br />