or not specifically called for at no additional cost to one of the methods indicated in paragraph
<br /> OWNER. 3.04; provided, however, that CONTRACTOR
<br /> shall not be liable to OWNER or ENGINEER-for
<br /> C: Clarifications andinterpretations of the failure to report_ any such conflict; error,
<br /> Contract.Documents:shall be issued by ENGINEER. ambiguity, or discrepancy . unless' CON-
<br /> as provided in Article 9.' TRACTOR knew or reasonably should have
<br /> known thereof.
<br /> 3.02 Refe_ rence Standards
<br /> B. Resolving Discrepancies,
<br /> A. Standards,..Specfcations, Codes, Laws, and
<br /> Regulations 1. Except as may be otherwise
<br /> specifically stated in the, Contract Documents,
<br /> 1. Reference to standards, specifica theprovisions of the Contract Documents shall
<br /> tions, manuals,. or codes of, any, .technical' take.precedence,in resolving.any conflict, error,
<br /> society, organization, or association,,or to.Laws ambiguity, or discrepancy between the
<br /> or Regulations,, whether such, reference be provisions of the Contract Documents and:
<br /> specific;or by,implicatioii, shall mean the stain-
<br /> dard, specification, manual, code, or Laws or a.the'. provisions of any standard,
<br /> Regulations in,effect at the:time of opening of specification, manual, code;. or instruction
<br /> Bids (or onthe Effective Date of the Agreement (whether or,not specifically incorporated by
<br /> if'.there were no Bids), except ,as. may be reference in the Contract Documents);or-
<br /> -otherwise .specifically stated in the Contract
<br /> Documents:. b. the provisions of any Laws or
<br /> Regulations applicable to the pe&miance
<br /> 2. Noprovision of any such standard, of the Work'(unless:such an interpretation of
<br /> specification„'manual or code,or any instruction' the provisions of'the Contract Documents
<br /> of a Supplier shall be effective to change the would -result in-violation :of such Law__. or
<br /> duties or :responsibilities of OWNER, Regulation)' _ _
<br /> CONTRACTOR, or ENGINEER, or=ariyof'.their
<br /> subcontractors,'consultants, agents,.or employ-. 3:04• Amending a_ nd Sdpplernenting Coritiacf
<br /> ees from those set= forth...in:; the Contract Documents
<br /> Documents,. "nor:shall any such V-6vis'ion:_or
<br /> instruction .be, effective.to assign to OWNER. �A, The Cbhtract-Docunientsmay be.'amendedto
<br /> ENGINEER, or any, of_ ENGINEER's provide for additions,, deletionph
<br /> s,- d-revision _s in the
<br /> Consultants, agents,',or,employees,any:duty or Woek'or to modify,-ttie terms and conditions thereof in
<br /> authority10 supervise,or direct.the performance_ one- or more of the 'following .ways: (i} a. Written
<br /> of the Work' or any: _duty, or 'authority-__to, Amendment; (ii) :a 'Change` Order; or, (iii) a, Work
<br /> undeitaket responsibility inconsistent .with the Change DirectiVe.
<br /> provisions of the-Contract Documents.,
<br /> B., 'The requirements'of..the'ContractDocuments
<br /> 3:03. Reporting andResolying Discrepancies may be supplemented, and minor variations "and
<br /> deviations iri-the Work may-be authorized, by_'one or
<br /> A., Reporting�Discrepancies' more of. the -following ways- (i); a Fieid"Order` (ii).
<br /> ENGINEER's approval of a.Shop Drawing;orSainple;T
<br /> 1. Ifduring the performance of ,thee or-.(iii) ENGINEER's written interpretation or clarifi-
<br /> 1Nork; CONTRACTOR discovers any conflict; cation.
<br /> error;ambiguity,,or discrepancywithin ahe Con=_-
<br /> tract Documents_ or, between the ;Contract. 3:05; �Oeuse,ofDocument's
<br /> Documents and. any provision of'_any Law,-or
<br /> Regul1 tion-applicable to the.performance;ofahe A: -CONTRACTOR and any_Subcontractor or
<br /> 1Nork;or of=any standard,,specification;:manual S'uppfier or other individual or entity, performing or
<br /> or:code, or of+.any:instruction of'any Supplier, furnishing anyrt.of=the Work under,-a director-indirect"
<br /> CONTRACTOR shall report-it to ENG INEER.in contract with OWNER:;(i) shall not have or=-acqu'i re.
<br /> writing, at once: CONTRACTOR 'shall not: any title to or:ownership 6' in anyof,ttie Drawings,;
<br /> Proceed'witti,the-Work affected thereby(except, Specifications;.or other;documents(or':copies`of any
<br /> in -an, emergency. as required :by paragraph thereof) _,prepared; by 'or bearing_ the seal- of
<br /> 6:16.A} until an, arnendriient:or,supplement to ENGINEER= or ENGINEER's Consultant,' including:
<br /> theaContracY Documents;has been issued by electronic media editions; and (ii),:shall not,reuse=.any'
<br /> 00700='Gsnsral Conditions REV 5-10-13:
<br /> 00700-a0
<br /> 'F:1Pubtic Worts\ENGINEERING DIVISION PROJECTS11330.1.R.C.-GoLine Transfer HublAdminlbid"documentsftasterContract Dooame�t$XWOD.General C&nditions REV 5-10-13.d6C,
<br />
|