discrepancy which CONTRACTOR may discover and <br /> shall obtain a written interpretation or clarification from 2.07 Initial Acceptance of Schedules <br /> ENGINEER before proceeding with any Work.affected <br /> thereby;however, CONTRACTOR shall not-be liable A. Unless otherwise provided in the Contract <br /> to. OWNER or. ENGINEER_for failure to ,report any, Documentsi at least ten days before submission of the <br /> conflict, error, ambiguity, or discrepancy in the -first Application.for Payment a conference attended by <br /> Contract Documents unless CONTRACTOR knew or CONTRACTOR, ENGINEER, and others as appropri- <br /> reasonably should have known thereof. ate will be:held to review for acceptability to ENGI- <br /> NEER-as_ provided below the.schedules submitted in <br /> B. Preliminary Schedules: Within-,ten days after accordance with paragraph 2.05.13. CONTRACTOR <br /> the.Effective Date,of the_'Agreement(unless otherwise. shall have an-additional ten days to make corrections <br /> specified in the-deneraI Requirements),�CONTRAC- and adjustments and to complete and resubmit the <br /> TO_ R shall submit to,ENG_ INE_ER for its-timely review: schedules._ No progress payment shall be made to <br /> 'CONTRACTOR until'. acceptable schedules. are <br /> 1. a preliminary progress schedule:. submitted to ENGINEER. i <br /> indicating:the times (numbers°of days or dates) I <br /> for starting and completing the various stages, 1'. The, progress schedule will be <br /> of the Work, including any Milestones specified, acceptable to ENGINEER if it provides an <br /> in the Contrac_t_Documents;._ orderly progression of the Work-to completion <br /> within any specified Milestones and the <br /> 2: a preliminary schedule of Shop Contract- Times.. Such acceptance will not <br /> Drawing and Sample submittals which MI'list-, impose on ENGINEER responsibility for the <br /> each-required submittal acid the times for sub- progress schedule; for sequencing; scheduling, j <br /> mitting; • reviewing,: and processing_ such 'or progress of the Work nor interfere with or i <br /> submittal', and relieve CONTRACTOR from_ _CONTRACTOR's I <br /> 'full responsibility therefor: <br /> 3. a preliminary schedule of values for <br /> i <br /> all of the.Work whicti includes quantities and, 2.- CONTRACTOR's schedule of Shop f <br /> prices of items whichwhen added.together Drawing 'and Sample ,submittals will be <br /> equal_ the.Contract Price=and subdivides the: acceptable to ENGINEER 'if it provides a f <br /> Work into component parts•in sufficient detail to .workable arrangement for reviewing and <br /> serve-. as •the- basis for progress,payments, processing the required submittals. i <br /> during performance of-the Work. .Such.prices; i <br /> will include.an appropriate amount of overhead a CONTRACTOR's .schedule of values i <br /> and profitiapplicable-to each item of Work: will be acceptable to'ENGINEER as to,form ' <br /> and substance, if, it provides a reasonable <br /> G: €vidense..ef lnsdran8e: R _ r^ n `^'^r'- ^ allocation-of_the;.Contract Price to component r <br /> }jun Qitn is o+'nrtc:J ( NTR4r`TQR nnd'fllh/AICt]sF,'.II• parts of the VVorli: <br /> d ,-+{mac .;+h nnnie +� t, - <br /> eaGh 4ivt r t_e�„�et er;.: �s�eaGh i <br /> ideRtifiAkfICCE 3-CONTRACT DOCUMENTS: INTENT, + <br /> se44atpe,_,ifl ' d -etheF, AMENDING-REUSE. t <br /> :nvidnnnn of incr rn�nne uih inh-ni-h^r .�f +hnmnr +nv. ( <br /> may <br /> " _ . - 3.01 intent' <br /> At#isle A . The-. Contract Docuents are. comple- <br /> mentary; what is called:for bm <br /> y one'is as binding as.if <br /> =2.06 Preconstruction Conference called:for by all. <br /> B. Ii is the intent-of.the Contract Documents.,to <br /> }n r hr r+ "L;efoFe � .1n at the Site is + tedescribe a functionally complete Project(or part there- <br /> n, 9* , r -.tp � r_ .+ o_0 to,be constructed in•accordance with the'Contract <br /> and i,thpp_ec nc =•.n:+r.:nri�+e-will i... fi.+ld=+n establish-'.,. r <br /> _ Documents,. Any labor, documentation, services, I <br /> -as to the materials; or- equipment that, may reasonably be , <br /> \ni gid;Rn; +n A, 16�ttia`Qr►,od rin� rnf^.rea'+:,;., _ inferred from. `the Contract Documents or from <br /> 95, prevailing custom or trade.usage.as being required to- <br /> Fand <br /> whether <br /> produce-the intended,result will be-provided <br /> 00706'-Genera!Conditions REV 5-100.13 I <br /> F tPubt c WoAcs1ENGINEE(tING OMSION PROJECTS11330 I.R C.Got iris Transfer HubWdm nlbid dowmentslMaster Contract Doaimenls500700-General Conditions REV 5 10.13.doc <br /> 1 <br />