discrepancy which CONTRACTOR may discover and
<br /> shall obtain a written interpretation or clarification from 2.07 Initial Acceptance of Schedules
<br /> ENGINEER before proceeding with any Work.affected
<br /> thereby;however, CONTRACTOR shall not-be liable A. Unless otherwise provided in the Contract
<br /> to. OWNER or. ENGINEER_for failure to ,report any, Documentsi at least ten days before submission of the
<br /> conflict, error, ambiguity, or discrepancy in the -first Application.for Payment a conference attended by
<br /> Contract Documents unless CONTRACTOR knew or CONTRACTOR, ENGINEER, and others as appropri-
<br /> reasonably should have known thereof. ate will be:held to review for acceptability to ENGI-
<br /> NEER-as_ provided below the.schedules submitted in
<br /> B. Preliminary Schedules: Within-,ten days after accordance with paragraph 2.05.13. CONTRACTOR
<br /> the.Effective Date,of the_'Agreement(unless otherwise. shall have an-additional ten days to make corrections
<br /> specified in the-deneraI Requirements),�CONTRAC- and adjustments and to complete and resubmit the
<br /> TO_ R shall submit to,ENG_ INE_ER for its-timely review: schedules._ No progress payment shall be made to
<br /> 'CONTRACTOR until'. acceptable schedules. are
<br /> 1. a preliminary progress schedule:. submitted to ENGINEER. i
<br /> indicating:the times (numbers°of days or dates) I
<br /> for starting and completing the various stages, 1'. The, progress schedule will be
<br /> of the Work, including any Milestones specified, acceptable to ENGINEER if it provides an
<br /> in the Contrac_t_Documents;._ orderly progression of the Work-to completion
<br /> within any specified Milestones and the
<br /> 2: a preliminary schedule of Shop Contract- Times.. Such acceptance will not
<br /> Drawing and Sample submittals which MI'list-, impose on ENGINEER responsibility for the
<br /> each-required submittal acid the times for sub- progress schedule; for sequencing; scheduling, j
<br /> mitting; • reviewing,: and processing_ such 'or progress of the Work nor interfere with or i
<br /> submittal', and relieve CONTRACTOR from_ _CONTRACTOR's I
<br /> 'full responsibility therefor:
<br /> 3. a preliminary schedule of values for
<br /> i
<br /> all of the.Work whicti includes quantities and, 2.- CONTRACTOR's schedule of Shop f
<br /> prices of items whichwhen added.together Drawing 'and Sample ,submittals will be
<br /> equal_ the.Contract Price=and subdivides the: acceptable to ENGINEER 'if it provides a f
<br /> Work into component parts•in sufficient detail to .workable arrangement for reviewing and
<br /> serve-. as •the- basis for progress,payments, processing the required submittals. i
<br /> during performance of-the Work. .Such.prices; i
<br /> will include.an appropriate amount of overhead a CONTRACTOR's .schedule of values i
<br /> and profitiapplicable-to each item of Work: will be acceptable to'ENGINEER as to,form '
<br /> and substance, if, it provides a reasonable
<br /> G: €vidense..ef lnsdran8e: R _ r^ n `^'^r'- ^ allocation-of_the;.Contract Price to component r
<br /> }jun Qitn is o+'nrtc:J ( NTR4r`TQR nnd'fllh/AICt]sF,'.II• parts of the VVorli:
<br /> d ,-+{mac .;+h nnnie +� t, -
<br /> eaGh 4ivt r t_e�„�et er;.: �s�eaGh i
<br /> ideRtifiAkfICCE 3-CONTRACT DOCUMENTS: INTENT, +
<br /> se44atpe,_,ifl ' d -etheF, AMENDING-REUSE. t
<br /> :nvidnnnn of incr rn�nne uih inh-ni-h^r .�f +hnmnr +nv. (
<br /> may
<br /> " _ . - 3.01 intent'
<br /> At#isle A . The-. Contract Docuents are. comple-
<br /> mentary; what is called:for bm
<br /> y one'is as binding as.if
<br /> =2.06 Preconstruction Conference called:for by all.
<br /> B. Ii is the intent-of.the Contract Documents.,to
<br /> }n r hr r+ "L;efoFe � .1n at the Site is + tedescribe a functionally complete Project(or part there-
<br /> n, 9* , r -.tp � r_ .+ o_0 to,be constructed in•accordance with the'Contract
<br /> and i,thpp_ec nc =•.n:+r.:nri�+e-will i... fi.+ld=+n establish-'.,. r
<br /> _ Documents,. Any labor, documentation, services, I
<br /> -as to the materials; or- equipment that, may reasonably be ,
<br /> \ni gid;Rn; +n A, 16�ttia`Qr►,od rin� rnf^.rea'+:,;., _ inferred from. `the Contract Documents or from
<br /> 95, prevailing custom or trade.usage.as being required to-
<br /> Fand
<br /> whether
<br /> produce-the intended,result will be-provided
<br /> 00706'-Genera!Conditions REV 5-100.13 I