My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents (unless there is a specific statement requiring an obligation of CONTRACTOR, <br /> indicating otherwise). The use of any such term or "provide' is implied. <br /> adjective shall not be effective to assign to ENGI= <br /> NEER,any duty'or,authority to supervise or direct E. Unless stated otherwise in the Contract Docu- <br /> the performance of the Work or -any duty or merits, words or phrases which have, a:well-known <br /> authority to undertake responsibility,contrary.to,the technical or construction industry or trade.meaning are <br /> provisions of paragraph,9.101or any-other provision used in the Contract,Documents iri "accordance with <br /> of the_Contract Documents: such recognized meaning. <br /> B. Day <br /> ARTICLE 2-PRELIMINARY MATTERS <br /> 1. The word "day" shall constitute a <br /> calendar day of 24 .hours measure_d from <br /> midnight to the next midnight. 2;01 Delivery of Bonds. <br /> C. Defective A. 'When CONTRACTOR delivers the-executed <br /> Agreements to OWNER; CONTRACTOR.,shall also <br /> 1. The word"defective,"when modifying deliver to OWNER such Bonds-, as CONTRACTOR <br /> the word "Work," refers 'to Work that is ,may be required to furnish. <br /> unsatisfactory; faulty, or deficient in.ttiat it does <br /> not conform to the Contract Documents or does 2.02 Copies of Documents <br /> not meet the-requirements of any inspection, <br /> reference standard;test, or approval,referred to A. :OWNER shall furnish.to;CONTRACTOR up <br /> in the. Contract, Document"§; or has been to ten"copies.of the'Contract;Documents. Additional <br /> daoaged. prior to ENGINEER's recom- copies will be fuir%ish_ed upon request at'the cost.of <br /> mend_ation of,final,.payment -(unless resporisi- reproduction. <br /> bility for the protection thereof has'_ been <br /> assumed by OWNER at Substantial 2.03 Comm_ericeinent'of Contract'Tiii e7 s,N6666,_ <br /> Completion in accordance with paragraph to Proceed' <br /> 14.04 or 14.05). <br /> A. The Contract Times will commence to run on' <br /> D.- Furnish; Install, P".erform; Provide the thirtieth-day'after the Effectiv.'e'Date of the Agree- <br /> ment=or; if:a Notice to Proceetl'is'given on the day <br /> 1. indicated,in,the Noticeto Proceed; A Notice to Pro- <br /> d6nneGthGA With ' ceed may be'given at any.time within 30,days after-the <br /> . Effective Date of the Agreement. In ti eventwill the <br /> FnateFF JZ n-F,.eqUIPFAP�t 494MContract Times' commence to. run later ;than' the <br /> ninetieth day'after the day. of'Bid`,opening ,or the <br /> thirtieth"day after'the'Effective-Date'of the',-- ement, <br /> seritiet� whicheverdate:is earlier: <br /> _. The ward' "insta;F" "w#aee= sed iii2:04,. .Starfing'the'Work, <br /> _ A. CONTRACTOR, shall' start.` to perforrri` the <br /> Work,on. the. date' when"the,Contract-Times coo- <br /> mence:to.run.. No Wotk-.shall be:dohe,at the:Site prior <br /> use. .to the-date on which..the Contract Times�comrrience to <br /> run.. <br /> X. The- werd& "peFfsFM`' OF q;° <br /> wh�R- _ - - 2:05 Before Starting."Construction. <br /> S—eF- A. :CONTRA CTORs-'ReVieiw of Contract Docu- <br /> ments., Before undertaking each part.of the'Work," <br /> +* CONTRACTOR shall carefully study.and compare:the: <br /> Contract Documents.,and check "and"verify pertinent <br /> 4 'When "furnish;" "install," "perform;' .or figures`therein and'all;applicable field'oeasurements: <br /> `'provide- is;.not used in.connection;.with services; CONTRACTOR' shalC promptly report .in=writing ao <br /> materials; or equipment' in a. context clearly ENGINEER; any- -conflict;-- error; ambiguity;: or <br /> 00700'General Candilians"i2E1%5:10-13: <br /> FaPublic WorksIENGINEERtNG DIVISION P.ROJECTS11330 LR.C.Goline Transfer HubWdminibid docUmentsVNasler Contras Doaunentst00700'-General Conditions REV 5=10-13.6o <br />
The URL can be used to link to this page
Your browser does not support the video tag.