TRACTOR prior to CONTRACTOR's <br /> then CONTRACTOR shall, promptly after becoming making_ such final commitment;or <br /> aware thereof and before further' „disturbing the <br /> subsurface or physical conditions or performing any c. CONTRACTOR failed to give the <br /> 'Work in connection there with(except in an emergency' written notice within •.the. time and as. re- <br /> as required,by paragraph 6.16.A), notify OWNER and quired by paragraph 4.03.A. <br /> ENGINEER in, writing about such= condition. <br /> CONTRACTOR shall •not further disturb• such 3. If OWNER and CONTRACTOR.are <br /> condition or perform any Work in,connection therewith unable to agree on entitlement to or on the <br /> (except as aforesaid)`until receipt of written orderto do amount,or extent, if anyi of any adjustment in <br /> so. the Contract Price o."Contract Times,.or both, a <br /> Claim may be made therefor as provided. in <br /> B. ENGINEERs Review: After receipt of written paragraph 10.05_. However; OWNER, <br /> notice as.required by paragraph 4.03.A, ENGINEER ENGINEER,. and E_NGINEER's: Consultants <br /> will,promptly r'evie'w the pertinent condition, determine shall not be liable to CON_ TRACTOR'.for any <br /> the: necessity ,of 'OWNER's obtaining additional claims, costs, losses, or damages (including <br /> exploration or tests with. respect thereto, and advise tint not limited .to all. fees and charges of <br /> OWNER in.writing (with a"copy to CONTRACTOR)of engineers, architects, attorneys, and other <br /> ENGINEER's findings andconclusions. professionals and all:court or arbitration,or-other <br /> dispute resolution, costs); sustained by <br /> C. Possible Price and Times Adjustments CONTRACTOR on or in connection with any <br /> other project or anticipated project. <br /> 1. The Contract.Price:"or the Contract: <br /> Times; or both;.will,be equitably,'adjusted to the 4_.04•. U_nderground Facilities <br /> extent that, the :existence- of such' differing <br /> subsurface or physical'condition causes an in- A. Shown or Indicated.•The.information acid data <br /> crease or decrease in.CONTRACTOR's cost 'shown or indicated in the Contract•Documents with <br /> of 'or .time: required for, performanceof the respect to existing'" Underground Facilities. at. or <br /> Work; subject; however,t6the following: .contiguous to the Site is, based-on information and <br /> data furnished 'to- OWNER for ,ENGINEER_ by 'ttie <br /> a.,such,condition:must rnbet.any one or: 'owners of. such Underground .Facilities, including <br /> more of,the=categories described in para- OWNER,; or by others. Unless it is.�`otherwise <br /> O. <br /> gra4.03.A;and expressly provided in the Supplementary Conditions: <br /> 16.-,with respect-to.Workrthat,is paid.for 1., OWNER and ENGINEER shat{ hot <br /> on a, Unit, Price Basisi, any 'adjustment in be responsible 'for the 'accuracy or com- <br /> Contract Price: wi8" be' subject„_to the p{eteriess of any such information or data;and <br /> provisions of'paragrapks:6.,b&and,1.1:03. <br /> 2. the-cost of all of,the following will'be <br /> 2; CONTRACTOR shall:not,be entitled included'in the:Contradt-Pdce, and; CONTRAC- <br /> to any,adjustment, in the 'Contract Price—or- TOR shall have full responsibility-for: <br /> Confract Times;if <br /> a:reviewing,. and checking; all such <br /> _;a.;CQNTRACTOa , knew:, of the information,and data; <br /> existence of; such conditions fat the time <br /> CONTRACTOR made::a 'final commitment b:locating, -all' Underground Facilities <br /> to <br /> .pWNER_in.respect`of Contract- rice,and ,shown or- indicated in ,ahe Contract <br /> Contract Times by ttie.submission of°a:Bid Documents, <br /> or, becoming: bound under• a; negotiated <br /> contract;or, c: coordination of the Work” witti, the. <br /> .owners ,of such Underground ,Facilities, <br /> ti:ithe existence;of such condition could including:OWNER, during construction, and" <br /> reasonably ,have; been discovered "or <br /> revealed: as a •result',-Of'any-examination; d: the,safety protection,.of:all:such: <br /> investigation,; exploration, test; or, study d' Underground,Facilities and repairing any, <br /> the Site and:contiguous areas required-by damage`thereto resulting from the Work., <br /> the: Bidding Requirements o"• 'Contract <br /> Dol:Aenfs,tobe'conducted.byor•for,CON- B: Noi.Shown:orindicafed: <br /> bd700-General Conditions REV 5-10-13. <br /> 0 = <br /> 0700.. 12 <br /> F:1Publ c WorksIENGINEERING DNISION PROJECTS11330 LRC.GoLine Transfer HuMAdminlbid documentslMastec Contract Documents10070W General Conditions REV 5 1413.doc- <br />