Laserfiche WebLink
locations, and shall be responsible for the accurate <br /> 1. If an Underground Facility is replacement or relocation of such reference points or <br /> uncovered or revealed at or contiguous-to the property monuments by professionally qualified <br /> Site which was 'not-shown or indicated; or not personnel. <br /> shown or indicated with reasonable accuracy in <br /> the Contract Documents,CONTRACTOR shall, 4.06 Hazardous Environmental Condition at-Site <br /> promptly after .becoming aware thereof. and <br /> before further disturbing conditions affected A. Reports;and Drawings. Reference is made to <br /> thereby;or performing any Work in connection the Supplementary Conditions for the identification of <br /> therewith (except in an emergency as required those reports and drawings, relating to a Hazardous <br /> by paragraph 6.16'A), identify the owner of Environmental Condition identified at the Site, if any; <br /> such Underground Facility and give written that have been utilized by- the ENGINEER in the <br /> notice to that owner and to OWNER and'ENGI- preparation of the Contract Documents:: <br /> NEER. ENGINEER willpromptly review,the.. <br /> Underground Facility and-determine the extent, B. Limned Reliance by CONTRACTOR on <br /> if any, to which a change is-required in- the Technical Data Authorized. CONTRACTOR may rely <br /> Contract Documents to reflect and document upon the general accuracy, of the- "technical data. <br /> the consequences of the existence or location contained in such reports and drawings, but;such <br /> of the Underground Facility. During such time, reports and drawings are not Contract Documents. <br /> CONTRACTOR shall be responsible for the Such "technical data" is identified in the <br /> safety and protection- of such Underground Supplementary Conditions. Except for such reliance <br /> Facility. on such"technical.data,"CONTRACTOR,may not rely <br /> upon or make any Claim, against. :OWNER, <br /> 2. If ENGINEER concludes that a ENGINEER or any of ENGINEER'_s Consultants with <br /> change in.the Contract Documents is required, respect to: <br /> a'Work.Change Directive or a Change'Order' <br /> .will be-issued, to re_fleet-and document. such. 1., the. completeness lof' such -reports <br /> consequences. An equitable adjustment shall and drawings for CONT_RACTOR's purposes; <br /> tie made in the Contract Price or Contract including`,, ut not limited to, any aspecfs of the <br /> Times; or both; to- the extent that they are, mean's, methods; techniques; sequences; and <br /> attributable-to the existence or location of any procedures of construction to'be:employed.;by <br /> Underground Facility that wins not shown or, CONTRACTOR and safety- precautions and <br /> indicated, or not -shown or indicated with, programs inciden_t thereto;or <br /> reasonable "accuracy in• the Contract <br /> Documents and that;CONTRACTOR did not 2; other data; interpretations, opinions <br /> know'of and could not reasonably have been and inforrriatidn contained in"such reporis'or <br /> 'expected'to .be aware of onto have"anticipated:, shown or indicated in such drawings;or <br /> If OWNER.and,CONTRACTOR are unable_to: <br /> agree.on ,entitlement-toor on.the amount or 3. any-CONTRACTOR interpretation of <br /> extent; if 'any,. of-any .such adjustment in or conclusion drawn from any_"technical data" <br /> Contract-Price;or Contract Tirnes; OWNER or, or-any such other data,-interpretations;opinions <br /> CONTRACTOR may make-a Claim therefor:as or information. <br /> provided in paragraph 10.05: <br /> C:, CONTRACTOR' shall not be• responsible for' <br /> 4.05 Reference Points -any Hazardous Environmental Condition uncovered or <br /> revealed.at.the Site:which.was not shown or indicated <br /> :A,. OWNER shall provide engineering surveys to -in7 Drawings or Specifications or identified ii%.the <br /> establish reference :points for-construction which in 'Contract Documents to be within the: scope_ of"the <br /> ENGINEER's _judgment 'are necessary. 'to enable Work'a_ CONTRACTOR:shall be responsible'_for' a <br /> CONTRACTOR to proceed :with the Work CON- Hazardous`Environmental Condition created with any <br /> TRACTOR shall be responsible for laying out:_the: materials' brought to, the' Site by CONTRACTOR, <br /> Work; shall protect; and preserve the established Subcontractors:_Suppliers,.,or anyone else for whom <br /> reference points_and property monuments; and shall_ CONTRACTOR is responsible. <br /> make no changes orrelocations`without the .prior <br /> written approyal-of OWNER., CONTRACTOR shall, D. If .CONTRACTOR encounters. a Hazardous <br /> report:to ENGINEER=whenever any reference point or- Environmental -Condition- or `if: ;CONTRACTOR; or <br /> property monument is lost or-destroyed or requires anyone: for whom, CONTRACTOR` Is responsible <br /> relocation because:of necessary.changes in grades_or creates a.; Hazardous Environmental .Condition, <br /> _ <br /> 0076j- <br /> General Conditions REV 51413 <br /> :'60706-- 13, <br /> F:1Pubtic WortcslENGINEERING DMStON PROJECTS11330.I.R C.Goline Transfer HubVWm nlbid dowmentslMaster Contract Doa,ments10070D-General Conditions REV 510.13.doc' <br />