Laserfiche WebLink
arbitration or other dispute resolution costs) 1. all persons on the Site or who may <br /> arising out of or relating to any claim-or action, be affected by the Work; <br /> legal or equitable, brought by any such owner <br /> or occupant against OWNER, ENGINEER, or .2. all the Work and materials and equip- <br /> any other party indemnified hereunder to the ment=to be incorporated therein, whether in <br /> extent caused by or based upon storage on or off the Site;:and <br /> CONTRACTOR's.performance of the Work._ <br /> 3. other property at the Site or adjacent <br /> B. Remoy_a!of Debris During Performance of the -thereto, including-trees,_ shrubs; lawns,.walks,. <br /> Work. During the progress of the Work CONTRAC= pavements, roadways, structures, utilities, and. <br /> TOR shall keep the Site and other areas free from Underground Facilities not designated for <br /> accumulations of waste materials, rubbish, and-'other removal, relocation, or replacement- in the <br /> debris. Removal and disposal of such waste materi- course.ofconstruction. <br /> als, rubbish,_and other debris shall conform to applica- <br /> ble Laws and Regulations. B. CONTRACTOR:shall comply with all applica- <br /> ble Laws and• Regulations relating to the safety of. <br /> C. Cleaning: Prior to Substantial Completion of persons or property, or to the protection of persons or <br /> the Work CONTRACTOR shall clean the Site and property from damage, injury, or loss; and shall erect <br /> make it ready for utilization by.OWN ER. At the com- and maintain all necessary safeguards for such safety <br /> pletion of the Work CONTRACTOR shall remove from and protection. CONTRACTOR shall notify owners of <br /> the Site-all tools, appliances, construction equipment adjacent property and of Underground Facilities and <br /> and machinery; and surplus materials and shall other utility owners when prosecution of the e Work may <br /> restore'to original condition all property not designated "affect them, and shall: cooperate 'with them in the <br /> for alteration_by tiie_ Contract Documents: protection, removal, relocation, ;and replacement of <br /> their property. All damage,_ injury, or loss to-any <br /> D. Loading Structures: CONTRACTOR shall not-, propeity referred to.in paragraph 6.13.A.2 or.6'.13:A.3 <br /> load nor permit any part of any structure to be loaded caused, directly or indirectly; in whole or in part; by <br /> in any,manner that will endanger the-structure, nor CONTRACTOR, any Subcontractor, Supplier,, or any <br /> .shall CONTRACTOR subject.any part.of.the Work or other individual or entity directly or;indirectly employed <br /> adjacent property to stresses or pressures that will by.ahy of them to perform any of the Work;or anyone <br /> endanger it. for whose acts any of them may be liable, shall be <br /> remedied by CONTRACTOR (except damage'or-loss <br /> 6.12: Record Docunldnts� 'attributable to the fault of Drawings or Specifications <br /> or to-the acts or omissions,of OWNER or ENGINEER <br /> X. CONTRACTOR shall maintain'in&safe place or ENGINEER's Consultant, or anyone employed by <br /> 'at the Site one record copy of all Drawings;Specifica- 'any of_themi or anyone for whose acts any. of_them <br /> tions,. Addenda,. Written Amendments, Change may- .be. liable, and not attributable; directly- or <br /> 'Orders;.Work..Change. Directives; Field Orders, and indirectly, in whole or in part,,to the-fault or,negligence <br /> written interpretations and clarifications in-_good order of,CONTRACTOR-or--any Subcontractor,,..Supplier,,-;or <br /> .and .annotated' to show' changes made during other individual or entity directly orindirectly employed <br /> construction: These:record' Iocuments,together with by any. of them).. C i TRACTOR's duties and <br /> all approved Samples and a7 counterpart of all responsibilities;:for-safety and for protection,of the <br /> approved-Shop--Drawings will be available to ENGI- Work-shall continue,until'such,time=as.-all the Work°is <br /> NEifk for reference:: Upon_completion-of-the-Work; completed and ENGINEER,has: issued-a .nofice_to <br /> these record_ ,documents,, Samples,- and .Shop, OWNER and'. CONTRACTOR in ;accordance: with <br /> Drawings Will.be'delivered to ENGINEER-for.OWNER: paragraph 14;07.'B that the- Work is; -acceptable <br /> ,(except as otherwise expressly provided in.connection <br /> 6,13 Safety and Protection with Substantial Completion). <br /> A CONTRACTOR,shall be solely .responsible 6.14- Safety Representative <br /> for initiating; maintaining,and =supervising all .safety <br /> precautions and programs in connection with the= A., CONTRACTOR shall designate a qualified <br /> Work. CONTRACTOR :shall take' all necessary and experienced -safety, representative at the Site <br /> precautions for-.the safety of, and shall provide the_ whose duties and responsibilities shall be the <br /> necessary protection to prevent damage;injury or loss prevention of- accidents and the maintaining .and <br /> to:- supervising of safety Precautions-and programs., <br /> 007 -General Conditions REV.510-13 <br /> 00700-23 _ <br /> F:%Pub is WorWENGINEERING DMSION PROJECTSM304.KC.GoUne Transfer HubVWmin%bid dowmentsWaster Contrad Docurnents%00700=Generil Conditions REV 551043.doc- <br />