arbitration or other dispute resolution costs) 1. all persons on the Site or who may
<br /> arising out of or relating to any claim-or action, be affected by the Work;
<br /> legal or equitable, brought by any such owner
<br /> or occupant against OWNER, ENGINEER, or .2. all the Work and materials and equip-
<br /> any other party indemnified hereunder to the ment=to be incorporated therein, whether in
<br /> extent caused by or based upon storage on or off the Site;:and
<br /> CONTRACTOR's.performance of the Work._
<br /> 3. other property at the Site or adjacent
<br /> B. Remoy_a!of Debris During Performance of the -thereto, including-trees,_ shrubs; lawns,.walks,.
<br /> Work. During the progress of the Work CONTRAC= pavements, roadways, structures, utilities, and.
<br /> TOR shall keep the Site and other areas free from Underground Facilities not designated for
<br /> accumulations of waste materials, rubbish, and-'other removal, relocation, or replacement- in the
<br /> debris. Removal and disposal of such waste materi- course.ofconstruction.
<br /> als, rubbish,_and other debris shall conform to applica-
<br /> ble Laws and Regulations. B. CONTRACTOR:shall comply with all applica-
<br /> ble Laws and• Regulations relating to the safety of.
<br /> C. Cleaning: Prior to Substantial Completion of persons or property, or to the protection of persons or
<br /> the Work CONTRACTOR shall clean the Site and property from damage, injury, or loss; and shall erect
<br /> make it ready for utilization by.OWN ER. At the com- and maintain all necessary safeguards for such safety
<br /> pletion of the Work CONTRACTOR shall remove from and protection. CONTRACTOR shall notify owners of
<br /> the Site-all tools, appliances, construction equipment adjacent property and of Underground Facilities and
<br /> and machinery; and surplus materials and shall other utility owners when prosecution of the e Work may
<br /> restore'to original condition all property not designated "affect them, and shall: cooperate 'with them in the
<br /> for alteration_by tiie_ Contract Documents: protection, removal, relocation, ;and replacement of
<br /> their property. All damage,_ injury, or loss to-any
<br /> D. Loading Structures: CONTRACTOR shall not-, propeity referred to.in paragraph 6.13.A.2 or.6'.13:A.3
<br /> load nor permit any part of any structure to be loaded caused, directly or indirectly; in whole or in part; by
<br /> in any,manner that will endanger the-structure, nor CONTRACTOR, any Subcontractor, Supplier,, or any
<br /> .shall CONTRACTOR subject.any part.of.the Work or other individual or entity directly or;indirectly employed
<br /> adjacent property to stresses or pressures that will by.ahy of them to perform any of the Work;or anyone
<br /> endanger it. for whose acts any of them may be liable, shall be
<br /> remedied by CONTRACTOR (except damage'or-loss
<br /> 6.12: Record Docunldnts� 'attributable to the fault of Drawings or Specifications
<br /> or to-the acts or omissions,of OWNER or ENGINEER
<br /> X. CONTRACTOR shall maintain'in&safe place or ENGINEER's Consultant, or anyone employed by
<br /> 'at the Site one record copy of all Drawings;Specifica- 'any of_themi or anyone for whose acts any. of_them
<br /> tions,. Addenda,. Written Amendments, Change may- .be. liable, and not attributable; directly- or
<br /> 'Orders;.Work..Change. Directives; Field Orders, and indirectly, in whole or in part,,to the-fault or,negligence
<br /> written interpretations and clarifications in-_good order of,CONTRACTOR-or--any Subcontractor,,..Supplier,,-;or
<br /> .and .annotated' to show' changes made during other individual or entity directly orindirectly employed
<br /> construction: These:record' Iocuments,together with by any. of them).. C i TRACTOR's duties and
<br /> all approved Samples and a7 counterpart of all responsibilities;:for-safety and for protection,of the
<br /> approved-Shop--Drawings will be available to ENGI- Work-shall continue,until'such,time=as.-all the Work°is
<br /> NEifk for reference:: Upon_completion-of-the-Work; completed and ENGINEER,has: issued-a .nofice_to
<br /> these record_ ,documents,, Samples,- and .Shop, OWNER and'. CONTRACTOR in ;accordance: with
<br /> Drawings Will.be'delivered to ENGINEER-for.OWNER: paragraph 14;07.'B that the- Work is; -acceptable
<br /> ,(except as otherwise expressly provided in.connection
<br /> 6,13 Safety and Protection with Substantial Completion).
<br /> A CONTRACTOR,shall be solely .responsible 6.14- Safety Representative
<br /> for initiating; maintaining,and =supervising all .safety
<br /> precautions and programs in connection with the= A., CONTRACTOR shall designate a qualified
<br /> Work. CONTRACTOR :shall take' all necessary and experienced -safety, representative at the Site
<br /> precautions for-.the safety of, and shall provide the_ whose duties and responsibilities shall be the
<br /> necessary protection to prevent damage;injury or loss prevention of- accidents and the maintaining .and
<br /> to:- supervising of safety Precautions-and programs.,
<br /> 007 -General Conditions REV.510-13
<br /> 00700-23 _
<br /> F:%Pub is WorWENGINEERING DMSION PROJECTSM304.KC.GoUne Transfer HubVWmin%bid dowmentsWaster Contrad Docurnents%00700=Generil Conditions REV 551043.doc-
<br />
|