6.15 Hazard Communication Programs approval of the pertinent submittal will be_at the sole
<br /> A. CONTRACTOR shall be responsible for
<br /> expense and responsibility of CONTRACTOR.
<br /> coordinating; any .exchange of material safety data D. ,Submittal Procedures,
<br /> sheets.or-other hazard communication 'Information
<br /> required to be made available to or exchanged be- 1., Before submitting each Shop
<br /> tween or among employers at the Site'in accordance Drawing or Sampled CONTRACTOR shall have
<br /> with Laws or Regulations. determined and verified:'
<br /> 6.16 Emergencies a. all. field measurements,, quantities,
<br /> dimensions, specified performance:,criteria,
<br /> A. In emergencies affecting•the safety or protec- installation requirements,. mater ials,.:.catalog
<br /> tion of persons or the Work orproperty�gt the Site orr numbers, .and similar, information with
<br /> adjacent thereto,CONTRACTOR is obligated to act to respect thereto;
<br /> prevent' threatened, damage,, injury, or loss.,
<br /> CONTRACTOR,shall give ENGINEER prompt written b. all materials with respect to.intended
<br /> notice if CONTRACTOR believes that any significant use, fabrication,shipping, handling, storage;,
<br /> changes in the Work or variations from the"Contract, assembly; and.installation pertaining to the
<br /> Documents have been n caused thereby,or,are required performance of the Work;
<br /> as'a result thereof. If ENGINEER determines,that a
<br /> change in the•Contract Documents isrequired be c. all .information relative to .means;
<br /> cause of the .action, taken by `CONTRACTOR in methods; techniques, sequences, and
<br /> response to such an emergency; a Work Change procedur'.es. of construction and safety.
<br /> Directive or Change Order will be:issued. precautions_:,and programs;incident-#hereto;
<br /> and
<br /> 6.17 -S_ho_p Dr iwin'gs:and'Samples
<br /> d:.CONTRACTOR shall 'also have
<br /> A. CONTRACTOR shall submit Shop;"Drawings reviewed- and coordinated each Shop
<br /> to ENGINEER for*review'and approval in"accordance Drawing or" .Sample with ottier Shop
<br /> With the acceptable schedule of Shop:Drawings and Drawings and.. Samples and" "with' "the
<br /> Sample submittals. All submittals will be identified'as requirements-of the Work,and the Contract
<br /> ENGINEER mayTrequire-and in the:nuriiber of copies: -Documents.
<br /> specified in.the General. Requirements. The data.
<br /> shown on -the Shop Drawings wilt be-complete with 2.. Each,submittal.shall,bear a stamp°br
<br /> respect,to :quantities;, dimensions,. _specifi'e'd ,perFor specific written' indication 4hat•CONTRACTOR
<br /> mance,and design criteria,.materials,,and similaf•data: has "satisfied CONTRACTOR'S" obligations
<br /> to show. 'ENGINEER the services,;. materials; and under the !Contract.Documents with"respect to
<br /> equipment`CONTRACTOR,proposes ;to°provide.and CONTRACTORjs,review and'approval_of.that
<br /> to enable`ENGINEER to revie'w,:the information.fo�the submittal..
<br /> limited purposes,required by paragraph 6:17.E..
<br /> 3: At,':the time,of each:subrnitfaL CON=
<br /> B. ;CONTRACTOR shall-also submit.Samples ta, TRACTOR; shall give; ENGINEER "specific
<br /> =ENGINEER for review and approval` in accordance: written notice.of,such variations, if any,_;ttiatahe
<br /> with-1he acceptable schedule of-Shop Drawings and Shop'Drawing or Sample.submitted may.have
<br /> Sample submittals., Each. Sample�,`will be 'identified 'froni ��the requirements of- the: ,Contract
<br /> clearly asto,material, Supplier;:pertinent'data,,such:as: Documents,;such notibe' to be in.a,written com=
<br /> catalog numbers, and,.& use.6,which.intended and, munication separate.from the,submittal;.and, in
<br /> otherwise as ENGINEERmayrequire_toenable ENGI_=? addition;sshall cause
<br /> ,;_a specific;notation=to be
<br /> NEER to;!review,the submittal for-the limited purposes- made on each 8hop`Drawing:.and:Sampie sub-
<br /> required by paragraph 6.17.E:,The numbers of,each mitted,to:ENGINEER-for;reviewand approval of.
<br /> Sample:to-be submitted will be as specified in;the: each such variation:
<br /> Sfic
<br /> p..eciations.
<br /> _ ._
<br /> E.., „ENGlNEERs Review.
<br /> C. -Where'a Shop:.Drawing.or,Sampl6,is•requi�edi'
<br /> by the Contract bocuments�oe'the,�schedu,l ,;of iShop, 1., ENGINEER,, wiH;aimely, review and
<br /> Drawings:and'Sample' submittais,acceptable:to.ENGI= approve Shop.; Drawings. and -Samples in
<br /> NEER .as^required:,by, paragraph 2.07,_ any related' accordance .with 'the= `schedule, of= Shop
<br /> Work_performed prior to:ENGINEER'S review and;; Drawings and Sample:submittals,.acceptgole to:
<br /> 00700'-General Condiiions REV 5-10-13
<br /> 00700x:24;
<br /> F:\P,ublic WorksIENGINEERING DNISION PROJECTS\1330=I.R.C.GoUne Transfer_Hub\Adminlbid documenls_Wasler Contract DocumentsW0700'-General Condilions'REV SL10-13.doc,,
<br />
|