Laserfiche WebLink
6.15 Hazard Communication Programs approval of the pertinent submittal will be_at the sole <br /> A. CONTRACTOR shall be responsible for <br /> expense and responsibility of CONTRACTOR. <br /> coordinating; any .exchange of material safety data D. ,Submittal Procedures, <br /> sheets.or-other hazard communication 'Information <br /> required to be made available to or exchanged be- 1., Before submitting each Shop <br /> tween or among employers at the Site'in accordance Drawing or Sampled CONTRACTOR shall have <br /> with Laws or Regulations. determined and verified:' <br /> 6.16 Emergencies a. all. field measurements,, quantities, <br /> dimensions, specified performance:,criteria, <br /> A. In emergencies affecting•the safety or protec- installation requirements,. mater ials,.:.catalog <br /> tion of persons or the Work orproperty�gt the Site orr numbers, .and similar, information with <br /> adjacent thereto,CONTRACTOR is obligated to act to respect thereto; <br /> prevent' threatened, damage,, injury, or loss., <br /> CONTRACTOR,shall give ENGINEER prompt written b. all materials with respect to.intended <br /> notice if CONTRACTOR believes that any significant use, fabrication,shipping, handling, storage;, <br /> changes in the Work or variations from the"Contract, assembly; and.installation pertaining to the <br /> Documents have been n caused thereby,or,are required performance of the Work; <br /> as'a result thereof. If ENGINEER determines,that a <br /> change in the•Contract Documents isrequired be c. all .information relative to .means; <br /> cause of the .action, taken by `CONTRACTOR in methods; techniques, sequences, and <br /> response to such an emergency; a Work Change procedur'.es. of construction and safety. <br /> Directive or Change Order will be:issued. precautions_:,and programs;incident-#hereto; <br /> and <br /> 6.17 -S_ho_p Dr iwin'gs:and'Samples <br /> d:.CONTRACTOR shall 'also have <br /> A. CONTRACTOR shall submit Shop;"Drawings reviewed- and coordinated each Shop <br /> to ENGINEER for*review'and approval in"accordance Drawing or" .Sample with ottier Shop <br /> With the acceptable schedule of Shop:Drawings and Drawings and.. Samples and" "with' "the <br /> Sample submittals. All submittals will be identified'as requirements-of the Work,and the Contract <br /> ENGINEER mayTrequire-and in the:nuriiber of copies: -Documents. <br /> specified in.the General. Requirements. The data. <br /> shown on -the Shop Drawings wilt be-complete with 2.. Each,submittal.shall,bear a stamp°br <br /> respect,to :quantities;, dimensions,. _specifi'e'd ,perFor specific written' indication 4hat•CONTRACTOR <br /> mance,and design criteria,.materials,,and similaf•data: has "satisfied CONTRACTOR'S" obligations <br /> to show. 'ENGINEER the services,;. materials; and under the !Contract.Documents with"respect to <br /> equipment`CONTRACTOR,proposes ;to°provide.and CONTRACTORjs,review and'approval_of.that <br /> to enable`ENGINEER to revie'w,:the information.fo�the submittal.. <br /> limited purposes,required by paragraph 6:17.E.. <br /> 3: At,':the time,of each:subrnitfaL CON= <br /> B. ;CONTRACTOR shall-also submit.Samples ta, TRACTOR; shall give; ENGINEER "specific <br /> =ENGINEER for review and approval` in accordance: written notice.of,such variations, if any,_;ttiatahe <br /> with-1he acceptable schedule of-Shop Drawings and Shop'Drawing or Sample.submitted may.have <br /> Sample submittals., Each. Sample�,`will be 'identified 'froni ��the requirements of- the: ,Contract <br /> clearly asto,material, Supplier;:pertinent'data,,such:as: Documents,;such notibe' to be in.a,written com= <br /> catalog numbers, and,.& use.6,which.intended and, munication separate.from the,submittal;.and, in <br /> otherwise as ENGINEERmayrequire_toenable ENGI_=? addition;sshall cause <br /> ,;_a specific;notation=to be <br /> NEER to;!review,the submittal for-the limited purposes- made on each 8hop`Drawing:.and:Sampie sub- <br /> required by paragraph 6.17.E:,The numbers of,each mitted,to:ENGINEER-for;reviewand approval of. <br /> Sample:to-be submitted will be as specified in;the: each such variation: <br /> Sfic <br /> p..eciations. <br /> _ ._ <br /> E.., „ENGlNEERs Review. <br /> C. -Where'a Shop:.Drawing.or,Sampl6,is•requi�edi' <br /> by the Contract bocuments�oe'the,�schedu,l ,;of iShop, 1., ENGINEER,, wiH;aimely, review and <br /> Drawings:and'Sample' submittais,acceptable:to.ENGI= approve Shop.; Drawings. and -Samples in <br /> NEER .as^required:,by, paragraph 2.07,_ any related' accordance .with 'the= `schedule, of= Shop <br /> Work_performed prior to:ENGINEER'S review and;; Drawings and Sample:submittals,.acceptgole to: <br /> 00700'-General Condiiions REV 5-10-13 <br /> 00700x:24; <br /> F:\P,ublic WorksIENGINEERING DNISION PROJECTS\1330=I.R.C.GoUne Transfer_Hub\Adminlbid documenls_Wasler Contract DocumentsW0700'-General Condilions'REV SL10-13.doc,, <br />