My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER. ENGINEER's review and <br /> approval will.be only to determine if the items 6.19 CONTRACTOR's General Warranty and <br /> covered by the submittals will, after installation Guarantee. <br /> or-incorporation in the;Work,-conform to the <br /> information given in the Contract Documents A. - CONTRACTOR wairants and.guarantees-to <br /> and be compatible with the design concept of OWNER; ENGINEER, and ENGINEER's Consultants <br /> the completed Project as a functioning whole as that°all Work will be,in accordance with the Contract <br /> a <br /> indic_ted by the Contract Documents. Documents and will not be defective. <br /> CONTRACTOR's warranty-.and guarantee hereunder <br /> 2,. ENGINEER's: review, and approval excludes defects or damage caused by: <br /> will.not extend to means, methods,,techniques, <br /> sequences, or procedures of- construction 1'. abuse, modification, or improper <br /> (except where a particular means, method, maintenance- or-- operation by. persons other <br /> technique,. sequence, or procedure of- con- than CONTRACTOR, Subcontractors, <br /> stiVetion is specifically and'expressly called for Suppliers, or-any other individual or. entity for <br /> by 'the- Contract Documents) or to, safety whom CONTRACTOR is responsible; or: <br /> precautions or programs incidedt'thereto. `The <br /> review and approval,of a separate item as such 2. normal wear and tear under normal <br /> Will: not indicate. approval of the assembly in usage. <br /> which.the item functions_ . <br /> B. CONTRACTOR's obligation to Perform and <br /> 3. ENGINEER's review and approval of. complete the-Work i.h accordance with the Contract <br /> Shop Drawings or. Samples shall not `relieve- Documents shall.be absolute: None of the following <br /> CONTRACTOR- from responsibility for any will constitute an acceptance of.Work1hat is not in <br /> variation from the requirements of-the Contract accordance.with the Contract Documents or a release <br /> Documents unless' CONTRACTOR 'has- in of.CONTRACTOR's obligation to perform the Work in <br /> writing called ENGINEER'S attention to- each accordance with the Con_tract Documents: <br /> such,variation at the time of each-submittal-as <br /> required- by paragraph 6.17.D.3 and ENG1-. 1., ob_servatioris_by ENGINEER; <br /> NEER has given written approval of each such <br /> variation:-by specific written notation. thereof 2. recommendation .by ENGINEER or <br /> incorporated in or accompanying the: Shop payment;by OWNER of any progress or final <br /> Drawing, .or :Sample approval;' nor will, any- payment; <br /> approval . by. ENGINEER relieve: CON <br /> TRACTOR. from responsibility. for complying =3. the issuance of a certificate-of-Sub- <br /> with the requirements of paragraph 6.17.D.1. stantial. Completion by ENGINEER or. any <br /> payment-related.1hereto by OWNER; <br /> F. Resubmittal.Procedures <br /> 4.: use or occupancy of:the Work or any <br /> 1.. CONTRACTOR:_shall make correct: part,th6fbof by OWNER-- <br /> Vons-required by:ENGINEER and shall -return <br /> the required' number of� corrected- copies of,- 5. any,-acceptance by OWNER or any <br /> Shop-;Drawings .and. submit as: requii-ed new' failure to do so <br /> Samples ;for review and' approval. <br /> CON-- <br /> TRACTOR::shall :direct" :specific, -attention in 6.: any review°and approval-oU a Shop <br /> writing:to revisions other than the,corrections Drawing or Sample submittal-or the issuance of <br /> called for by ENGINEER- -on, previous. a_notice;of acceptability by ENGINEER; <br /> submittals, <br /> 7.1 any inspection, test_, or: approval by <br /> 6.18 Continuing the;Work. others;.or :.._ <br /> A. CONTRACTOR shall carry.on,the Work and '8.: any correction of-defective Work by <br /> adhere ta.t e-progress schedule during.all disputes or OWNER: <br /> disagreements with OW_NER. No--Work :shall. be- <br /> -delayed or postponed, pending resolution of, any-- 6.20. Indemnification <br /> disputes or disagreements,.-except as:permitted by <br /> paragraph 15.04' r as;OWNER and CONTRACTOR A. To the fullest extent permitted by Laws.and- <br /> may <br /> ndmay otherwise:agree'in writing. Regulations; CONTRACTOR shall indemnify and hold <br /> 00700-'General Conditions REV 5-100.13 <br /> FIlublic WotkslENGINEERING DMSION FROJECTS\13304.R.C.GoLina Transfer HuMAdmin%bid doaimentsWaster Contract Docurnents100700-General Conditions REV 5=10.13.doC* <br />
The URL can be used to link to this page
Your browser does not support the video tag.