My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. If the proper execution or results of any part of 8.03 Furnish Data <br /> CONTRACTOR's Work depends upon work per- <br /> formed-by others under this-Artide 7,CONTRACTOR A. OWNER shall promptly furnish the data <br /> shall inspect such.other work:and promptly report to required of OWNER under the Contract Documents.- <br /> ENGINEER in writing any-delays, defects, or deficien- <br /> cies in such other,work that render it:unavailable.or- 8.04 Pay Promptly When Due <br /> unsuitable for the properexecution and results of <br /> CONTRACTOR's _Work. CONTRACTOR's failure to A. OWNER shall.make payments to..CONTRAC- <br /> so report will constitute•an acceptance of such other- TQR promptly when, they are due .as provided. in <br /> work as' fit- and proper for integration with paragraphs 14.02.0 and 14.07.C. <br /> CONTRACTOR's Work except for latent defects and <br /> deficiencies in such otherwork.. 8.05 Lands and Easements;Reports.and Tests <br /> 7.02 Coordination A., OWNER's duties in respect of providing lands <br /> and-easements and providing engineering.surveys to <br /> A. If,OWNER intends,to contract with others for establish reference,points are set forth in paragraphs <br /> the-performance.of other,work on the Project at-the 4.01 and 4.05. Paragraph.4.02 - refers to OWNER's <br /> Site; the following will be set forth_ in Supplementary identifying and making available to CONTRACTOR <br /> Conditions: copies of reports- <br /> eports of explorations and _tests of <br /> subsurface conditions and drawings• of physical <br /> 1. the individual or entity who will have conditions in or- relating to existing surface or <br /> authority and responsibility for coordination of subsurface.structures at or contiguous to the Site that <br /> 'the activities among the various contractors will have been utilized by ENGINEER in preparing the <br /> be identified; Contract Documents. <br /> 2: the-specific-matters to be covered by- 8.06 Insurance <br /> such; authority-: and fesponsibility will. be,. <br /> itemized;and A:• OWN ER's.responsibilities, if,any, in respect tb <br /> purchasing and maintaining liability and pr6pertyinsur- <br /> 3. the .extent of such authority and once dre set forth in Arf_cle 5. <br /> responsibilitieswill be.provided. <br /> 8:07 Change Orders <br /> B. Unless otherwise provided- in. the, <br /> Supplementary Conditions, OWNER shall have sole. A. OWNER is obligated td execute Change- <br /> authority <br /> hange- <br /> authority and responsibility for such coordination. Orders as indicated.in'paragraph 10.03.- <br /> 8.08 Inspectidns;_.Tests,.and Approvals <br /> .ARTICLE 8=OWNER'S RESPONSIBILITIES' <br /> - A., OWNER's-responsibility 'in-respectao certain <br /> inspections, tests, and 'approvals. is set 'forth in <br /> 8.01 bommunkationslo Contractor-- paragraph 13.03.B:, <br /> A. Except as ,otherwise, :provided in these 8.09 Limitations.on OWNER's Responsibilities= <br /> General_Conditions, OWNER.shall issue all communi- <br /> cations-to CONTRACTOR.through ENGINEER. A: The OWNER_shall not supervise, direct,`or <br /> have control or authon'4 over; nor'-be responsibleffor, <br /> -8.-62 Replacement of ENGINEER• CONTRACTOR's .means, methos, techniques,' se- <br /> quences, or.procedures of construction,;or the.safety <br /> A. In=case of termination of the:employment of precautions'and programs incident thereto; or for any <br /> ENGINEER,. OWNER shall appoint-an- engineer to failure -of-,CONTRACTOR to comply,with Laws,and <br /> whom CONTRACTOR makes no, reasonable 'Regulations. applicable`lto the, performance ,of; the <br /> objection„ whose status under the ! Contract Work. OWNER -will not. be responsible; =for <br /> Documen_is shall-tie that of•the former ENGINEER. CONTRACTOR`s failure, to perform. the Work =in <br /> -accordance with the Contract Documents. <br /> 00700-General Conditions REV 510-.13 <br /> 00700-•27_ <br /> Fvubric Wor8 G_lNEERING DMSION PR0JECTS113304.R.C.GoLirie Transfer HublAdmin%bid dowmentsWlaster Contract Documenls100700-General Conditions REV 510-13.doc= <br />
The URL can be used to link to this page
Your browser does not support the video tag.