8.10 Undisclosed Hazardous Environmental of ENGINEER'S visits or observations 'of
<br /> Condition CONTRACTOR's Work ENGINEER will 'not
<br /> supervise,'direct,.control;'or have authority over or be
<br /> A. OW_NER's responsibility in respect to. an (esponsible`for CONTRACTOR's means, methods,
<br /> undisclosed Hazardous Environmental Condition is" techniques, sequences, or procedures of construction,
<br /> set forth in paragraph 4 06 or the safety precautions. and programs incident
<br /> thereto, or for any failure of CONTRACTOR to.comply
<br /> 8.11 Evidence of Financial.Arrangements with Laws and. Regulations.. applicable to the'
<br /> performance!of the Work.
<br /> A. If and to,the extent OWNER has agreed to
<br /> furnish I CONTRACTOR =reasonable-. evidence that 9.03 Project Representative
<br /> 'financial arrangements have-,been made 10 "satisfy
<br /> OWNER'S obligations.underthe Contract Documents, A. If OWNER and ENGINEER. agree, ENGI=
<br /> OWNER's.responsibility in respect thereof will be as, NEER will furnish a Resident Project Representative
<br /> set forth in the Supplementary Conditions: to assist ENGINEER, in providing more extensive
<br /> observation of-the Work.. The responsibilities and
<br /> authority and limitations thereon of any suchResident
<br /> ARTICLE 9,-ENGINEER'S STATUS DURING, Project, Representative.. and, assistants will be as
<br /> CONSTRUCTION provided in paragraph;9.10 and in the-Supplementary.
<br /> Conditions. if OWNER designates another represen-
<br /> tative or agent to represent OWNER at-the Site who is
<br /> 9.01. 'OWNER'SRepresentative not ENGINEER's Consultant', agent or employee, the
<br /> responsibilities and authority and limitations-thereon of
<br /> ,A: ENGINEER will be OWNER's:representative such other individual or entity will tie as provided in the
<br /> during the, construction period. The duties and,; Supplementary Conditions.
<br /> responsibilities. and the limitations of authority of
<br /> ENGINEER ,as OWNER's representative ,during, 9.04: Clarifications,and Interpretations-
<br /> construction are set"�forik`inl the Contract,Documents:
<br /> and will not be changed without written consent of A. ENGINEER will issue with _reasonable
<br /> OWNER and'ENGINEER. promptness such written. clarifications. or'interpreta-
<br /> ;6 s of the"requirements'of the Conteacfbocuments
<br /> 9.02_ Visits to Site -as'ENGINEER.may determine ne'cessary,-which shall
<br /> be`'consistent: With the intent of; and reasonably
<br /> A. ENGINEER, will make_ visits. to ;the Site at inferable from ttie:Contract Documents. Such written"
<br /> intervals appropriate to the:va�ious.stages of,consttuc- clarification's and'interpretations wily be binding; on
<br /> tiara ;as`jENGINEER. deems `necessary in-order to. OWNER.aiid`CONT_.RACTOR. If OWNER and CON-
<br /> observe asl 'an 'experienced and qualified design' TRACTOR are unable_,to agree:on entitlementb.or;on
<br /> professional the progress tt at has been made and the: the-amounf-br�extent, if`any, of any adjustment'in°the
<br /> quality-of the ;Various-aspects, of CONTRACTOR's' Contract Price or.Contract Times';.or both, that sfiould
<br /> executed: Work Based .on iriforrnati-, obtained lie owed.-as- a_ . resuluof a written' clarification or
<br /> Ong such Visits and observations,'-ENGINEER,;for interpretation; aClaim may, .be made_ 'therefor, as
<br /> the`beneft"of''OWNER; will determjrie in general, if 'provided in
<br /> Work-)i proceeding in.accordance.:witli jfie Con
<br /> '-tract Documents.. 'ENGINEER-`will not,be required-to -9:05 Authorized Variations in Work
<br /> make exhaustive or-continuoussinspecbo'ns on the,Site� -
<br /> to check the, quality or quantity of the. Work.:, A., ENGINEER may,authorize minor variations in
<br /> ENGINEER's efforts will'be directed toward providing the Work frorim '.the;, requirements of the :Contract
<br /> for OWNER a'greater degree:of°confidence that the; Documents�which-do,not'involvean adjustment in'the
<br /> completed Work`wilVd6nform:generally,ao the'Contract Contract.Price_or thei Contract Times and are compati-
<br /> Documents.., :On' the basis of such- visits and :ble witti the design concept of ttie-completed,Project
<br /> observations .ENGINEER-Will keep:OWNER informed as,a functioning 'whole as' indicated by the"Contract
<br /> of the;progress of the Work.and`.will endeaVor.to'guard .Documents: These may,be,accohiplished by-a:Field
<br /> OWNER-against.defecbve`W6rk. Order-ands will :be�".binding;on;="OWNER;and-:also on
<br /> 'CONTRACTOR; who:shall perform the:VVork-involved
<br /> B "ENGINEER's. _visits, and, observations: -are- -promptly. 'If'OWNER'aricfCONTRACTOR are unable
<br /> subject to all the"limitations on.ENGINEER's-authority. to-,agree on'entitlement,to oron the amount.or extent;
<br /> and., responsibility�set:forth in paragraph 9.10;., and. -if any; of. any adjustment in._the Contract;I'Price:or
<br /> particularly, bufi,withouf limitation,.during or as�.a result' Contract;Times;,of"both; as a;result of a Field Order,
<br /> 00700-General Conditions REV 510=13
<br /> '00700.4'28;
<br /> F:1Public W&I slENG,INEERING DIVISION PROJECTS113WI.PM:GoLina Transfer Hu id doouinentsWaster Coiitmct Do&inits%00700;�General Conditions REV 5-10-1 3.d66,
<br />
|