as provided in paragraph-12.02.A. Delays beyond the ARTICLE 13-TESTS AND.INSPECTIONS;
<br /> control of CONTRACTOR shall include, but- not be CORRECTION, REMOVAL OR ACCEPTANCE'OF
<br /> limited to, acts or neglect by,OWNER, acts or neglect DEFECTIVE WORK
<br /> ,of u6lity,owners.or other contractors performing_other°
<br /> work-. as contemplated by Article 7, fires, floods;
<br /> epidemics, abnormal weather conditionsi or acts of 13.0. 1 Notice of Defects
<br /> God_.
<br /> A. Prompt notice of all defective..Work of which
<br /> 12:0.4= Delays Within"CO_NT_ RA CTOR:s.'Contro_l OWNER or ENGINEER has actual knowledge will be
<br /> given to CONTRACTOR. All defective.Work-may be
<br /> A. The Contract-Times(or Milestones)"will not be rejected, corrected,•or accepted_as provided;in this
<br /> extended due to delays within the control of Article-11
<br /> CONTRACTOR. Delays attributable to-and within the,
<br /> -control' of. a Subcontractor_ or Supplier shall be 13.02 Access to Work
<br /> deemed_ to be delays within the control of CO__NTRAC-
<br /> TOR''. A.- OWNER; ENGINEER, ENGINEER's Con-
<br /> sultants, other representatives ,and personnel of
<br /> 12:05 Delays Beyond OWNER's a_ rid OWNER, independent testing laboratories, and
<br /> CON_TRACTOR's,Contiol governmental agencies with-jurisdictional'interests'will
<br /> have access to the-Site and the Work°at reasonable
<br /> A Where` CONTRACTOR is prevented from 'times for their-observation; inspecting, and testing.
<br /> completing any part of*the Work within the,Contract- CONTRACTOR.TOR.shall provide them proper and safe
<br /> Times�(or Milestones) due to delay beyond.the control conditions for .such access -and advise them of
<br /> of both OWNER_and CONTRACTOR, an extension ofCONTRACTOR's Site ' safety* procedures. .and
<br /> the Contract: Times (oc Milestones) in .an amount programs so that "they may comply: therewith* as
<br /> equal to. the:time lost-due to such delay`shall be' applicable.
<br /> CONTRACTOR's sole and exclusive remedy for.such
<br /> "delay. 13.03 Tests and.lnspections
<br /> 12.06, Delay Damages- A. CONTRACTOR:"shall give.ENGINEER.timely
<br /> notice of readiness of the Work for all required
<br /> A. In..no eventstiall OWNER or ENGINEER be.. inspections, :tests, or approvals:-and shalLcooperate
<br /> liable-.,to- CONTRACTOR; any- Subcontractor, any with 'inspection -and testing, personnel to facilitate
<br /> Supplier, or any otherr person or organization;or to any' required.inspections or tests:
<br /> surety.-for-or`employee or:agent of any of.them; for
<br /> damages-arising out of or resulting from:. B:.
<br /> 1. delayscaused by or within-the control ,
<br /> of.CONTRACTOR;;or .
<br /> 2. _ delays- beyond' the. control of both.
<br /> ,OVVNER.and CONTRACTOR including but,not. _ .
<br /> _limited. to fires,_ floods;: epidemics; abnormal. beI9*11
<br /> _weather conditions,, acts of God,- or-acts- or-
<br /> neglect'
<br /> rneglect'by-utility,owners or-other-contractors," _. i h a i ssstr. irtswrFPd iP,7AAAPAt0AA,4Asith
<br /> performing other work, as contemplated :by' to
<br /> Articlej.`
<br /> andz
<br /> B: Nothing in this paragraph 12:06 bars a,
<br /> change in Coritract;Price pursuantto.this Article,12#o'
<br /> compensate CONTRACT.ORi due, jo delay, _
<br /> interference; or disruption .directly attributable to.
<br /> actions or.inactions of;OWNER or�anyone-for-whom- C.. If Laws or Regulations of; any public body
<br /> OWNER isresponsible. having.Jurisdiction.require any Work;(or part,thereof)
<br /> specifically to be inspected, tested,,or approved by an
<br /> .employee or other representa.0ve of such public body;
<br /> CONTRACTOR.. shall -assume; full; responsibility for-
<br /> arranging and; obtaining.-such inspections, tests, .or
<br /> 00700-Genial CondiGa REV.:r,.10-13
<br /> 60700-"35: