approvals, pay all costs in connection therewith, and to be defective, CONTRACTOR shall be allowed an <br /> furnish ENGINEER the required certificates of inspec- increase in the Contract Price or an extension of the <br /> tion or approval. Contract Times (or Milestones), or both, directly <br /> attributable to such uncovering, exposure, <br /> D. CONTRACTOR shall be responsible for observation, inspection, testing, replacement, and <br /> arranging and obtaining and shall pay all costs in reconstruction. If the parties are unable to agree as to <br /> connection with any inspections, tests, or approvals the amount or extent thereof, CONTRACTOR may <br /> required for OWNER's and ENGINEER's acceptance make a Claim therefor as provided in paragraph <br /> of materials or equipment to be incorporated in the 10.05. <br /> Work; or acceptance of materials, mix designs, or <br /> equipment submitted for approval prior to 13.05 OWNER May Stop the Work <br /> CONTRACTOR's purchase thereof for incorporation <br /> in the Work. Such inspections, tests, or approvals A. If the WOFk is defeGtive, OF GONTRACTOR <br /> shall be performed by organizations acceptable to ffi <br /> OWNER and ENGINEER. materials 9F fails te pe4r.-the +r� <br /> E. If any Work (or the work of others) that is to <br /> be inspected, tested, or approved is covered by CON- , <br /> TRACTOR without written concurrence of ENGI- until the Ga Ise f^: .sash-eide. has been eliminated <br /> NEER, it must, if requested by ENGINEER, be uncovhGweveF, thiG Fight of OWNER to stop the WGFk s <br /> - <br /> ered for observation. net give Fose to any duty 9R the paFt of G-WINIER t9 <br /> exeFGise this Fight fop the benefit of GONTRAGTOR, <br /> F. Uncovering Work as provided in paragraph <br /> 13 03.E shall be at CONTRACTOR's expense unless 9F eRtity, 9F aRY 6161" f9F, OF employee eF agent of <br /> CONTRACTOR has given ENGINEER timely notice aRY of them, <br /> of CONTRACTOR's intention to cover the same and <br /> ENGINEER has not acted with reasonable prompt- 13.06 Correction or Removal of Defective Work <br /> ness in response to such notice. <br /> A. CONTRACTOR shall correct all defective <br /> 13.04 Uncovering Work Work, whether or not fabricated, installed, or <br /> completed,or, if the Work has been rejected by ENGI- <br /> A. If any Work is covered contrary to the written NEER, remove it from the Project and replace it with <br /> request of ENGINEER, it must, if requested by ENGI- Work that is not defective. CONTRACTOR shall pay <br /> NEER, be uncovered for ENGINEER's observation all Claims, costs, losses, and damages (including but <br /> and replaced at CONTRACTOR's expense. not limited to all fees and charges of engineers, <br /> architects, attorneys, and other professionals and all <br /> B. If ENGINEER considers it necessary or court or arbitration or other dispute resolution costs) <br /> advisable that covered Work be observed by ENGI- arising out of or relating to such correction or removal <br /> NEER or inspected or tested by others, CONTRAC- (including but not limited to all costs of repair or <br /> TOR, at ENGINEER's request, shall uncover, expose, replacement of work of others). <br /> or otherwise make available for observation, inspec- <br /> tion, or testing as ENGINEER may require, that 13.07 Correction Period <br /> portion of the Work in question, furnishing all neces- <br /> sary labor, material, and equipment. If it is found that A. <br /> such Work is defective, CONTRACTOR shall pay all <br /> Claims, costs, losses, and damages(including but not <br /> limited to all fees and charges of engineers,architects, <br /> attorneys, and other professionals and all court or <br /> arbitration or other dispute resolution costs)arising out GentFaGt DeGuments, any WoFk is found to be <br /> of or relating to such uncovering, exposure, observadefeGtive, oF if the repair of any daFnages4G-#ie4aAd <br /> - <br /> tion, inspection, and testing, and of satisfactory 9F aFeas Fnade available fGF CONTRACTOR's use-by <br /> replacement or reconstruction (including but not OWNER 9F peFFRitted by Laws and Regulations as <br /> limited to all costs of repair or replacement of work of GeAtemplated in paFagFaph 6.44.A is feund to bee <br /> others); and OWNER shall be entitled to an ,witheut Gest <br /> appropriate decrease in the Contract Price. If the <br /> parties are unable to agree as to the amount thereof, ser <br /> OWNER may make a Claim therefor as provided in , if the deferative <br /> paragraph 10.05. If, however, such Work is not found <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-36 <br /> F:1Public WorkstENGINEERING DIVISION PROJECTS%1330-I.R.C.GoLine Transfer HuMAdminlbid clocumentsWaster Contract Documents100700-General Conditions REV 5.10-13.doc <br />