My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-2.06 Delete paragraph GC-2.06.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract, but before the CONTRACTOR begins <br /> work, the Project Manager will call a preconstruction conference at a place <br /> the ENGINEER designates to establish an understanding among the parties <br /> as to the work and to discuss schedules referred to in paragraph 2.05 8, <br /> procedures for handling Shop Drawings and other submittals, and <br /> maintaining required records Utility companies and others as appropriate <br /> will be requested to attend to discuss and coordinate work. <br /> B. Per the FDOT Standard Specifications for Road and Bridge Construction, the <br /> Contractor will certify to the Engineer the <br /> following- <br /> 1. A listing of on-site clerical staff, supervisory personnel and their pro-rated time <br /> assigned to the contract, <br /> 2. Actual Rate for items listed in Table 4-3.2 1 (see below), <br /> 3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits <br /> and a Retirement Plan, and, <br /> 4. Payment of Per Diem is a company practice for instances when <br /> compensation for Per Diem is requested. <br /> Such certification must be made by an officer or director of the Contractor <br /> with authority to bind the Contractor. Timely certification is a condition <br /> precedent to any right of the Contractor to recover compensations for such <br /> costs, and failure to timely submit the certification will constitute a full, <br /> complete, absolute and irrevocable waiver by the Contractor of any right to <br /> recover such costs Any subsequent changes shall be certified to the <br /> Engineer as part of the cost proposal or seven calendar days in advance of <br /> performing such extra work. <br /> FDOT Table 4-3 2.1 <br /> Item Rate <br /> FICA Rate established by Law <br /> FUTA/SUTA Rate established by Law <br /> Medical Insurance Actual <br /> Holidays, Sick&Vacation Benefits Actual <br /> Retirement Benefits Actual <br /> Rates based on the National Council on <br /> Compensation Insurance basic rates tables <br /> Workers Compensation adjusted by Contractor's actual experience <br /> modification factor in effect at the time of the <br /> additional work or unforeseen work <br /> Per Diem Actual but not to exceed State of Florida's rate <br /> Insurance* Actual <br /> *Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br /> insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc ). <br /> SC-3.06 Coordination of Plans,Specifications, and Special Provisions <br /> SC-3.06 Add the following new paragraphs immediately after paragraph GC-3.05- <br /> SC-3 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows: <br /> 00800-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.