My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Written Interpretations <br /> 2 Addenda <br /> 3 Specifications <br /> 4. Supplementary Conditions to the General Conditions <br /> 5 General Conditions <br /> 6 Approved Shop Drawings <br /> 7. Drawings <br /> 8. Referenced Standards. <br /> B. Written/computed dimensions shall govern over scaled dimensions. <br /> SC-4.02 Subsurface and Physical Conditions <br /> SC-4 02 Add the following new paragraphs immediately after paragraph GC-4.02.8: <br /> C In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site: <br /> Subsurface investigation, prepared by KSM Engineering and Testing, Inc., May 15, <br /> 2015. Report included in the drawings on sheet C201 <br /> SC-5.01 Performance, Payment and Other Bonds <br /> SC-5.01.A. Delete paragraph GC-5.01.A in its entirety and insert the following paragraphs in its <br /> place: <br /> Within fifteen (15) days of receipt of the Contract Documents for execution, the <br /> CONTRACTOR shall furnish a Public Construction Bond in an amount <br /> equal to 100% of the Contract Price. <br /> 1. In lieu of the Public Construction Bond, the CONTRACTOR may furnish <br /> an alternative form of security in the form of cash, money order, certified <br /> check, cashier's check, irrevocable letter of credit or a security as listed in <br /> Part II of F.S Chapter 625. Any such alternative form of security shall be <br /> for the same purpose, and be for the same amount and subject to the <br /> same conditions as those applicable to the bond otherwise required The <br /> determination of the value of an alternative form of security shall be made <br /> by the OWNER <br /> 2 Such Bond shall continue in effect for one (1) year after acceptance of the <br /> Work by the OWNER <br /> 3. The OWNER shall record the Public Construction Bond with the Public <br /> Record Section of the Indian River County Courthouse located at 2000 <br /> 16th Avenue, Vero Beach, Florida 32960 <br /> SC-5.03 Certificates of Insurance <br /> 00800-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.