My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br /> credit given to OWNER to deduct all such costs from any payments otherwise <br /> due the CONTRACTOR <br /> 6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br /> emergency upon specific permission of the ENGINEER <br /> SC-6.06 Concerning Subcontractors, Suppliers, and Others <br /> SC-6.06.C. Add the following sentence at the end of paragraph GC-6.06.C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br /> entity, to the extent practicable, information about amounts paid to CONTRACTOR on <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity <br /> SC-6.08 Permits <br /> SC-6.08 Add the following paragraphs immediately after paragraph GC-6.08.A: <br /> 1 The CONTRACTOR shall obtain and pay for all other required permits and licenses <br /> The CONTRACTOR shall provide copies of the permits to the OWNER and <br /> ENGINEER and shall comply with all conditions contained in the permits at no extra <br /> cost to the OWNER <br /> 2 The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements. The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with. <br /> 3 Permits, Licenses, Fees and related requirements <br /> A. Contractor's requirement's. <br /> 1. The CONTRACTOR shall procure all permits and licenses, and give all notice <br /> necessary and incidental to the performance of the Work, including but not limited to <br /> all- <br /> - Building permit(s)for the "Primary Building Structure" and the "Exterior Shelter <br /> Structures"from all applicable jurisdictional agencies reviewing and approving the <br /> building plans (IRC Building Department, IRC DOH, IRC Fire Marshall/Emergency <br /> Services, and others); and all other permits issued by or through the building <br /> department that are necessary to construct the building and building systems or <br /> components, and any exterior improvements, systems, components, or <br /> infrastructure, <br /> - SWPPP permit(s). (FDEP, IRC), <br /> - De-watering permit(s): (SJRWMD, FDEP Industrial Wastewater, IRFWCD, IRC), <br /> - Irrigation well permit(s): IRC DOH, FDEP and/or SJRWMD permits and approvals <br /> for non-potable water(irrigation)well construction/drilling and water use. <br /> - Other permits and approvals customarily provided by contractor, or listed within the <br /> contract documents <br /> 2. The CONTRACTOR shall pay all jurisdictional agency inspection fees and plan <br /> review fees, and all other fees issued by or through all other applicable jurisdictional <br /> agencies reviewing and approving the building plans (IRC DOH, IRC Fire <br /> Marshall/Emergency-Services, and others)that are necessary to construct the building <br /> 00800-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.