SC-11 01.A.1. Delete paragraph GC-11.01.A.1 in its entirety, and insert the following sentences <br /> in its place: <br /> 1 CONTRACTOR will receive payment for actual costs of direct labor and burden <br /> (see SC-2.06.6) for the additional or unforeseen work. Labor includes foremen <br /> actually engaged in the work, and will not include project supervisory personnel nor <br /> necessary on-site clerical staff, except when the additional or unforeseen work is a <br /> controlling work item and the performance of such controlling work item actually <br /> extends completion of the project due to no fault of the Contractor. Compensation <br /> for project supervisory personnel, but in no case higher than a Project Manager's <br /> position, shall only be for the pro-rata time such supervisory personnel spent on <br /> the contract. In no case shall an officer or director of the Company, nor those <br /> persons who own more than 1% of the Company, be considered as project <br /> supervisory personnel, direct labor or foremen hereunder. The expenses of <br /> performing Work outside of regular working hours, on Saturday, Sunday, or legal <br /> holidays, shall be included in the above to the extent authorized by OWNER. <br /> SC-13.03 Test and Inspections <br /> SC-13 03 B. Delete paragraph GC-13 03.B in its entirety, and insert the following sentences in <br /> its place <br /> B OWNER shall empley and paf er the con f '�ppe Rdent te6tinn labeFateF to <br /> a ioi ❑is aci viccv vi a'i r i" crivcnr-ccvrn <br /> exGeptthese iRSpe Gtipnc tests or approval o h eq } <br /> �.Ya .�pc, uviiv, ccvcv�n approvals hated immediately �1cIeW. �{iv�cctcreRz <br /> . , eGtiong tests, or apprvvaaly required aftef H}Itialfai�ginspeotiens, tests, of <br /> The CONTRACTOR shall arrange, obtain, and pay for the <br /> following inspections,tests, or approvals <br /> 1 Inspections, tests, or approvals covered by paragraphs 13 03 C and 13.03 D <br /> below; <br /> 2. Costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 04 B shall be paid as provided in said paragraph 13.04.6; <br /> 3 Tests otherwise specifically provided in the Contract Documents. <br /> SC-13.05 OWNER May Stop the Work <br /> SC-13 05.A. Delete paragraph GC-13.05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment, or fails to comply with permit <br /> requirements, or fails to comply with the technical specifications, or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br /> portion thereof, until the cause for such order has been eliminated, however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part of <br /> OWNER to exercise this right for the benefit of CONTRACTOR, any <br /> Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br /> employee or agent of any of them. <br /> 00800-11 <br />