Laserfiche WebLink
SECTION 010240 <br /> CONTINGENCY <br /> 1.1 General <br /> CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br /> necessary to perform additional work not covered on the Contract Drawings. The <br /> Contingency Account is intended as a contingency for unforeseen work. <br /> 1.1 PAYMENT <br /> A. Lump sum amount for contingency account work is included in the bid schedule. <br /> The value of contingency account work will be determined in accordance with Article <br /> 12 of the General Conditions <br /> + + END OF SECTION + + <br /> 010240- 1 <br />