Laserfiche WebLink
SECTION 01 1000—SUMMARY OF WORK <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including i General and Supplementary <br /> Conditions and other Division 01 Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> A. Section Includes: <br /> 1. Project information. <br /> 2. Work covered by Contract Documents. <br /> 3. Phased construction. <br /> 4. Work by Owner. <br /> 5. Work under separate contracts. <br /> 6. Future work. <br /> 7. Purchase contracts. <br /> 8. Owner-furnished products. <br /> 9. Contractor-furnished, Owner-installed products. <br /> 10. Access to site. <br /> 11. Coordination with occupants. <br /> 12. Work restrictions. <br /> 13. Specification and drawing conventions. <br /> 14. Miscellaneous provisions. <br /> B. Related Requirements: <br /> 1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures <br /> governing temporary use of Owner's facilities. <br /> 1.3 PROJECT INFORMATION <br /> A. Project Identification: Indian River County Go-Line Bus Transfer Hub. <br /> 1. Project Location: 1225 16"Street,Vero Beach,FL 32960. <br /> B. Owner: Indian River County Board of County Commissioners. <br /> 1. Owner's Representative: Richard B. Szpyrka, P.E.,Assistant Public Works Director, <br /> Indian River County, 1801 27th Street Vero Beach,FL 32960. <br /> C. Engineer/Prime Consultant: Joseph W.Schulke,P.E.,Schulke,Bittle& Stoddard,LLC,1717 <br /> Indian River Blvd.,Suite 201,Vero Beach,FL 32960. <br /> 011000-1 <br />