My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. On-Site Work Hours: Limit work to normal business working hours of 7:00 a.m. to 5:00 p.m., <br /> Monday through Friday,unless otherwise indicated. <br /> 1. Hours for Utility Shutdowns: Tuesday through Thursday, normal business hours. <br /> 2. Any work requiring inspections,witnessing testing,etc.,by IRC, COVB,utility providers, <br /> the architect, or project engineers on weekends or outside of their normal business hours <br /> (7:00 a.m. to 4:00 p.m.) shall be pre-approved by the architect or engineer(as applicable) <br /> and owner; and contractor shall be responsible for payment of engineer's or architect's <br /> inspection fees at their overtime hourly rates. <br /> C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or <br /> others unless permitted under the following conditions and then only after providing temporary <br /> utility services according to requirements indicated: <br /> 1. Notify Owner not less than two (2) days in advance of proposed utility interruptions. <br /> 2. Obtain Owner's written permission before proceeding with utility interruptions. <br /> D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and <br /> vibration, odors, or other disruption to adjacent property owners or tenants. <br /> 1. Notify Owner not less than two(2) days in advance of proposed disruptive operations. <br /> 2. Obtain Owner's written permission before proceeding with disruptive operations. <br /> E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet(8 In) of <br /> entrances, operable windows, or outdoor-air intakes. <br /> F. Controlled Substances: Use of tobacco products and other controlled substances on Project site <br /> is not permitted. <br /> G. Employee Screening: Comply with Owner's requirements for [drug] [and] [background] <br /> screening of Contractor personnel working on Project site. <br /> 1. Maintain list of approved screened personnel with Owner's representative. <br /> 1.14 SPECIFICATION AND DRAWING CONVENTIONS <br /> A. Specification Format:The Specifications are organized into Divisions and Sections using the 16- <br /> division format and CSUCSC's "MasterFormat"numbering system. <br /> 1. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the <br /> Work of all Sections in the Specifications. <br /> B. Drawing Coordination: Requirements for materials and products identified on Drawings are <br /> described in detail in the Specifications. One or more of the following are used on Drawings to <br /> identify materials and products: <br /> 1. Terminology: Materials and products are identified by the typical generic terms used in <br /> the individual Specifications Sections. <br /> 2. Abbreviations- Materials and products are identified by abbreviations [published as part <br /> of the U.S.National CAD Standard]. <br /> 011000-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.