My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Furniture systems (furnished and installed by owner) <br /> C. Communication systems (servers, UPS, network equipment) (furnished and installed by <br /> owner) <br /> d. Surveillance camera system(furnished and installed by owners) <br /> e. Exterior furniture(benches)(installed by contractor) <br /> f. Trash receptacles and cigarette receptacles (installed by contractor) <br /> g. Display case in building waiting area(furnished and installed by owner) <br /> h. Mural or wrap art in building waiting area(furnished and installed by owner) <br /> 1. Heavy duty storage shelves in recycle room (furnished and installed by owner) <br /> j. Digital signs at 8 bus pick up locations(furnished and installed by owner) <br /> k. Vending machine(furnished and installed by owner) <br /> 1. Plaque(installed by contractor) <br /> 1.10 CONTRACTOR-FURNISHED, OWNER-INSTALLED PRODUCTS <br /> A. Contractor shall furnish products indicated. The Work includes unloading,handling, storing,and <br /> protecting Contractor-furnished products as directed and turning them over to Owner at Project <br /> closeout. <br /> B. Contractor-Furnished, Owner-Installed Products: <br /> 1. <NOT USED>. <br /> 1.11 ACCESS TO SITE <br /> A. General: Contractor shall have full use of the Project site for construction operations during <br /> construction period, except that contractor shall permit ingress/egress by COVB Public Works <br /> Department(traverse through site)as noted on the plans. Contractor's use of Project site is limited <br /> by Owner's right to perform work or to retain other contractors on portions of Project and limited <br /> as noted or depicted in the contract documents/plans. <br /> 1.12 COORDINATION WITH OCCUPANTS <br /> A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to <br /> occupy and to place and install equipment in completed portions of the Work,prior to Substantial <br /> Completion of the Work, provided such occupancy does not interfere with completion of the <br /> Work. Such placement of equipment and limited occupancy shall not constitute acceptance of <br /> the total Work. <br /> 1. Architect will prepare a Certificate of Substantial Completion for each specific portion of <br /> the Work to be occupied prior to Owner acceptance of the completed Work. <br /> 1.13 WORK RESTRICTIONS <br /> A. Work Restrictions, General: Comply with restrictions on construction operations. <br /> 1. Comply with limitations on use of public streets and with other requirements of authorities <br /> having jurisdiction. <br /> 011000-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.