My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.6 WORK BY OWNER <br /> A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering <br /> with or delaying work under this Contract or work by Owner. Coordinate the Work of this <br /> Contract with work performed by Owner. <br /> B. Preceding Work: Owner will perform the following construction operations at Project site. Those <br /> operations are scheduled to be substantially complete before work under this Contract begins. <br /> 1. Owner has no construction operations planned. <br /> C. Concurrent Work: Owner will perform the following construction operations at Project site. <br /> Those operations will be conducted simultaneously with work under this Contract. <br /> 1. Owner construction operations include the installation of equipment and/or building <br /> systems that, due to the location,'type, complexity of the equipment or systems, requires <br /> installation concurrent with work under this contract, including: <br /> a. Communication systems(servers,UPS,network equipment) <br /> 2. The Contractor's work includes receiving, unloading; handling, storing, and protecting <br /> owner furnished products or equipment to be incorporated in the owner's construction <br /> operations, and coordinating work schedule with Owner's subcontractor(s). <br /> D. Subsequent Work: Owner will perform the following additional work at site after Substantial <br /> Completion. Completion of that work will depend on successful completion of preparatory work <br /> under this Contract. <br /> 1. Installation of furniture and equipment typically found in an office building, including <br /> telephones and computers. <br /> 1.7 WORK UNDER SEPARATE CONTRACTS <br /> A. Not Used. <br /> 1.8 FUTURE WORK <br /> A. The Contract Documents include requirements that will allow Owner to carry out future work <br /> following completion of this Project;provide for the following future work: <br /> 1. Not Used. <br /> 1.9 OWNER-FURNISHED PRODUCTS <br /> A. Owner will furnish products indicated. The Contractor's work includes receiving, unloading, <br /> handling,storing,protecting,installing(when indicated on the plans),Owner-furnished products, <br /> and making building services connections to the products after owner installation/construction, <br /> and coordinating the work schedule with Owner's subcontractor(s). <br /> B. Owner-Furnished Products: <br /> a. Three(3)Big Belly solar powered trash compactors (installed by contractor) <br /> 011000-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.