Laserfiche WebLink
complete system and shall include the requisite foundation system, structural <br /> metal/aluminum framing system, flat metal roof panels where indicated, and <br /> sloped metal roofing system to match the primary building where indicated on <br /> the plans, together with flashing trim, fascia, gutters and downspouts, and <br /> decorative architectural features as depicted on the conceptual plans to match <br /> the architectural style, color, materials, and textures of the primary building. <br /> These features shall include but may not be limited to decorative columns, <br /> fascia, sloped roof, and exposed rafters. The engineer and architect of record <br /> for this project provided by IRC (owner) must review and approve the shop <br /> drawings for the building system prior to the issuance of a building permit. The <br /> design shall be substantially in conformance with the preliminary architectural <br /> plans provided in the contract documents/plans. Mechanical, electrical, and <br /> plumbing engineering and preliminary architecture design has been provided for <br /> this building by IRC(owner) but is subject to revisions. <br /> C. Site improvements for the 1.60 +/- acre site development area, together with <br /> "off-site" improvements in 16`h Street. The site improvements include all <br /> clearing, earthwork, paving, drainage, and utilities, sidewalks, landscaping, <br /> irrigation systems, and all other site construction work listed or described in the <br /> contract documents/plans and site development permits. <br /> 2. The project is required to comply with the "Green Commercial Building Designation <br /> Standard of the Florida Green Building Coalition, Inc." as specified in Division 1 Section <br /> "018113.13 Sustainable Design and Construction Requirements," Florida Green <br /> Building Coalition (FGBC), Commercial Building Certification Standards. The <br /> Contractor has a significant responsibility to ensure compliance and certification is received. <br /> 3. The project is funded by the Federal Transit Administration(FTA) and is subject to <br /> compliance requirements of the Buy America Act (1982) as amended as well as other <br /> standard Federal Requirements incorporated into the contract. The project requires the <br /> contractor to comply with the Davis Bacon Act, Equal Employment Opportunity Act, and <br /> Buy American requirements and other Federal requirements. For non-DBE prime <br /> contractors, participation of DBE subcontractors in an amount of work equal to or greater <br /> than 1% of the total bid is encouraged by the County. <br /> B. Type of Contract: <br /> 1. Project will be constructed under a single prime contract. <br /> 1.5 PHASED CONSTRUCTION <br /> A. The Work shall be conducted in a single phase. <br /> B. Before commencing Work, Contractor shall submit a construction schedule showing the <br /> sequence, commencement and completion dates, and move-in dates of Owner's personnel. <br /> 011000-3 <br />