My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
complete system and shall include the requisite foundation system, structural <br /> metal/aluminum framing system, flat metal roof panels where indicated, and <br /> sloped metal roofing system to match the primary building where indicated on <br /> the plans, together with flashing trim, fascia, gutters and downspouts, and <br /> decorative architectural features as depicted on the conceptual plans to match <br /> the architectural style, color, materials, and textures of the primary building. <br /> These features shall include but may not be limited to decorative columns, <br /> fascia, sloped roof, and exposed rafters. The engineer and architect of record <br /> for this project provided by IRC (owner) must review and approve the shop <br /> drawings for the building system prior to the issuance of a building permit. The <br /> design shall be substantially in conformance with the preliminary architectural <br /> plans provided in the contract documents/plans. Mechanical, electrical, and <br /> plumbing engineering and preliminary architecture design has been provided for <br /> this building by IRC(owner) but is subject to revisions. <br /> C. Site improvements for the 1.60 +/- acre site development area, together with <br /> "off-site" improvements in 16`h Street. The site improvements include all <br /> clearing, earthwork, paving, drainage, and utilities, sidewalks, landscaping, <br /> irrigation systems, and all other site construction work listed or described in the <br /> contract documents/plans and site development permits. <br /> 2. The project is required to comply with the "Green Commercial Building Designation <br /> Standard of the Florida Green Building Coalition, Inc." as specified in Division 1 Section <br /> "018113.13 Sustainable Design and Construction Requirements," Florida Green <br /> Building Coalition (FGBC), Commercial Building Certification Standards. The <br /> Contractor has a significant responsibility to ensure compliance and certification is received. <br /> 3. The project is funded by the Federal Transit Administration(FTA) and is subject to <br /> compliance requirements of the Buy America Act (1982) as amended as well as other <br /> standard Federal Requirements incorporated into the contract. The project requires the <br /> contractor to comply with the Davis Bacon Act, Equal Employment Opportunity Act, and <br /> Buy American requirements and other Federal requirements. For non-DBE prime <br /> contractors, participation of DBE subcontractors in an amount of work equal to or greater <br /> than 1% of the total bid is encouraged by the County. <br /> B. Type of Contract: <br /> 1. Project will be constructed under a single prime contract. <br /> 1.5 PHASED CONSTRUCTION <br /> A. The Work shall be conducted in a single phase. <br /> B. Before commencing Work, Contractor shall submit a construction schedule showing the <br /> sequence, commencement and completion dates, and move-in dates of Owner's personnel. <br /> 011000-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.