My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 011100 <br /> REGULATORY REQUIREMENTS <br /> PART 1 -- GENERAL <br /> 1.01 PERMITS REQUIRED- All permits necessary for the construction of the work shall be <br /> obtained by the Contractor, except those pen-nits already obtained by the owner and listed <br /> below. Copies of permits obtained by the owner for the project are attached to the end of <br /> this section. Contractor shall review the pernits/approvals, familiarize itself with all pen-nit <br /> conditions, and include the materials and labor to meet all conditions and requirements <br /> within the scope of work of this contract, whether the conditions and requirements are <br /> depicted on the drawings or listed below or listed on the permits. <br /> A. Indian River County <br /> 1 Building plans — Building plans for the primary structure (3410 sf+-) have been <br /> submitted to the Indian River County Building Department for initial plan review. <br /> Plans have been revised pursuant to the building department's initial review There <br /> may be additional review comments based on a subsequent resubmittal. The <br /> contractor will be required to apply for all budding pen-nit applications for all <br /> proposed construction. The plan review permit application numbers are as follows: <br /> a. Primary Building: 2015100221 <br /> NOTE: This does not include the plan review for the covered canopy/exterior <br /> structures. The Contractor shall provide final design, engineering and <br /> architectural design and prepare and submit all requisite permit applications for <br /> these structures. <br /> 2. Site Development Approvals <br /> a. Site Plan Approval — The project has received COVB site plan approval <br /> (No. SP15-000014)—December 8,2015. <br /> b. Land Clearing / Tree Removal - The project has received land clearing / <br /> Tree removal permit from the COVB (No.TR15-000086)December 8,2015. <br /> C. IRC Concurrency — The project has been reviewed and deemed to meet <br /> concurrency requirements. All impact fees have been paid, except COVB utility <br /> (water and sewer)and IRC Solid waste.IRC will pay all impact fees. <br /> Notification: The COVB public works department—Matt Mitts, COVB Engineer, <br /> 1053 20`'Place,Vero Beach,FL 32960 (772) 978-5151 shall be notified and attend <br /> a pre-construction meeting, and shall be notified 48 hours prior to commencement <br /> of work.A certification of completion for each pen-nit/approval and as-built survey <br /> is required to be submitted at job close-out. <br /> 011100-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.