Laserfiche WebLink
SECTION 011100 <br /> REGULATORY REQUIREMENTS <br /> PART 1 -- GENERAL <br /> 1.01 PERMITS REQUIRED- All permits necessary for the construction of the work shall be <br /> obtained by the Contractor, except those pen-nits already obtained by the owner and listed <br /> below. Copies of permits obtained by the owner for the project are attached to the end of <br /> this section. Contractor shall review the pernits/approvals, familiarize itself with all pen-nit <br /> conditions, and include the materials and labor to meet all conditions and requirements <br /> within the scope of work of this contract, whether the conditions and requirements are <br /> depicted on the drawings or listed below or listed on the permits. <br /> A. Indian River County <br /> 1 Building plans — Building plans for the primary structure (3410 sf+-) have been <br /> submitted to the Indian River County Building Department for initial plan review. <br /> Plans have been revised pursuant to the building department's initial review There <br /> may be additional review comments based on a subsequent resubmittal. The <br /> contractor will be required to apply for all budding pen-nit applications for all <br /> proposed construction. The plan review permit application numbers are as follows: <br /> a. Primary Building: 2015100221 <br /> NOTE: This does not include the plan review for the covered canopy/exterior <br /> structures. The Contractor shall provide final design, engineering and <br /> architectural design and prepare and submit all requisite permit applications for <br /> these structures. <br /> 2. Site Development Approvals <br /> a. Site Plan Approval — The project has received COVB site plan approval <br /> (No. SP15-000014)—December 8,2015. <br /> b. Land Clearing / Tree Removal - The project has received land clearing / <br /> Tree removal permit from the COVB (No.TR15-000086)December 8,2015. <br /> C. IRC Concurrency — The project has been reviewed and deemed to meet <br /> concurrency requirements. All impact fees have been paid, except COVB utility <br /> (water and sewer)and IRC Solid waste.IRC will pay all impact fees. <br /> Notification: The COVB public works department—Matt Mitts, COVB Engineer, <br /> 1053 20`'Place,Vero Beach,FL 32960 (772) 978-5151 shall be notified and attend <br /> a pre-construction meeting, and shall be notified 48 hours prior to commencement <br /> of work.A certification of completion for each pen-nit/approval and as-built survey <br /> is required to be submitted at job close-out. <br /> 011100-1 <br />