Laserfiche WebLink
The Contractor shall notify all known utility providers including "Sunshine Locates" in <br /> the area and request utility locates. The Contractor shall notify all utilities 48 hours prior <br /> to start of construction. <br /> J. Other-Permits/Approvals <br /> The Contractor is responsible for obtaining any stormwater or de- <br /> watering/discharge permits and any building permits necessary for the work, <br /> including,but not limited to: <br /> • FDEP N.O.I. to use Generic Permit for Stormwater Discharge from Large <br /> or Small Construction Activities <br /> • FDEP Industrial Wastewater- "Generic permit for the Discharge of <br /> Produced Groundwater from any Non-Contaminated Site Activity" <br /> • SJRWIYID transferable consumptive use permit known as a "Noticed <br /> General Permit for Short Tenn Construction De-watering" <br /> • Building Department permits, as applicable. (Building/structure, plumbing, <br /> electrical, mechanical, irrigation, paving, LP tank, walls, fences, and all <br /> others necessary) <br /> • DOH—well construction and water use pennits <br /> K. Federal Transit Administration(FTA): The contractor is responsible for adherence to all FTA <br /> Standard Contract Clauses. Reference Sections "Agreement (Public Works)" <br /> (00520) and "Federal Transit Administration (FTA) Standard Contract Clauses" <br /> (00421). <br /> 011100-4 <br />