survey, adequate and passing utility test results —which shall be submitted prior <br /> to placing the system into service. <br /> F. ACOE <br /> 1. Permit: A Nationwide Permit number 46 has been issued for this project. ACOE <br /> —No. SAJ-2015-02418 (NW-46); issued 8/5/15. <br /> 2. Notification: The Contractor shall notify the ACOE of the following: The ACOE <br /> shall be notified within 10 days of the start of the work,the ACOE shall be notified <br /> in writing of the date of commencement of the work authorized by the permit, and <br /> within 60 days of completion, the "Self Certification Statement of Compliance" <br /> (form attached with permit) must be completed and submitted to the ACOE. . <br /> Reporting address is: US Anny Corps of Engineers, Regulatory Division, <br /> Enforcement Section,P.O.Box 4970,Jacksonville FL 32232. <br /> G. FDEP SWPPP <br /> 1. Permit: N.O.I. to use "Generic Pen-nit for Stormwater Discharge from Large and <br /> Small Construction Activities" must be submitted by the Contractor, with the <br /> Contractor as the applicant and maintenance/operation entity. This permit requires <br /> that the Contractor conduct and document routine inspections. <br /> 2. Notification: At the completion of the project, the Contractor shall file a <br /> "N.P.D.E.S. Stormwater Notice of Termination". <br /> 3. A SWPPP has been prepared for Contractor's use in securing the permit and for the <br /> continuous planning and direction to comply with permit conditions. The SWPPP <br /> included with the construction plans is a suggested minimum plan for adherence to <br /> the FDEP NOI requirements. This plan is available (in CAD) for Contractor to use, <br /> edit and modify for its intended purposes. The Contractor is responsible for the <br /> plan's design and implementation, and is strongly encouraged to review, edit and <br /> take ownership of this plan. <br /> H. SJRWMD <br /> 1. Permit: An Individual pen-nit authorizing the construction of a surface water <br /> management system (No. 142891-1) has been obtained for this project. The <br /> Contractor shall review and abide by all the conditions. <br /> 2. Notification: The Contractor shall notify the SJRWMD of the following: SJRWMD <br /> must be notified 48 hours prior to the commencement of construction on district <br /> form no. 62-330.350(1), and within 30 days of completion of construction, submit <br /> the"As-Built Certification and Request for conversion to the operation phase"form <br /> (form 62-330.310(1)). <br /> 1. Utility Companies <br /> 1. Permits: N.A. IRC has coordinated with COVB T&D, and has depicted the <br /> proposed utility connection points and off-site modifications/relocations on the <br /> plans. The Contractor shall coordinate its work with all utility providers. Contacts <br /> during plan preparation were: COVB—Chris Blahnik(772-978-5460). <br /> The Contractor shall coordinate final off-site utility connections and service <br /> provisions with AT&T,Kirk Walker;Ph: (772)460-4455; and Comcast— <br /> Anthony Springsteel;Ph: (772)692-9010 x 69936 <br /> IRC has submitted plans of site construction to: <br /> -COVB Water and sewer,Todd Young,(772)978-5215 <br /> -AT&T,Kirk Walker;Ph: (772)460-4455 <br /> -Comcast,Anthony Springsteel;Ph: (772)692-9010 x 69936 <br /> 011100-3 <br />