Laserfiche WebLink
Inter-Office Memorandum <br /> Indian River County-Public Works Department <br /> Traffic Engineering Division <br /> TO: David Hays,P.E.,C.F.M.,Land Development Manager <br /> FROM: Jeanne Bresett,Trac <br /> DATE: October 1,2015 <br /> SUBJECT: M O.T.for Construction in the Right-of-Way <br /> Location:122516"'Street <br /> Job Type:Go Line Bus Hub-COVB <br /> Applicant:Indian River County–Mr.Joseph Schulke,P.E. <br /> ROW Permit:2015090351 <br /> Plans dated September 11,2015: Attached are Traffic Engineering's Special Conditions for Right- <br /> of-Way Permit,as well as the Regulations for the Maintenance of Traffic for the above referenced <br /> project. Also, included are the specific F.D.O.T.Traffic Design Standard indices for the Traffic <br /> Control Plans applicable for this project. <br /> 1)The contractor shall install stand mounted Advance Construction signing,in accordance with, <br /> F.D.O.T.Standard Index 602 for any work or activities that encroaches the area between two(2) <br /> feet to fifteen(15)feet outside of the travel way. <br /> 2) Traffic shall be restricted to a single lane when any work or activities encroaches the area <br /> between the centerline and 2 feet outside of the travel.way.One-lane closures shall be in <br /> accordance with F.D.O.T.Standard Index 603. Traffic Engineering shall be notified <br /> 24 hours in advance of any lane closings. <br /> —_3)�I here shallbe no excavehons lett open atter dace—---- --- ------- -- — <br /> 4) All construction equipment and materials shall:be stored a minimum of 15 feet from the <br /> edge of pavement and shall be protected by Type 11 Barricades with flashing yellow lights. <br /> 5) Construction fencing used in the work area to protect equipment or excavations shall not block <br /> sight distance near intersections or driveways. <br /> 6) Indian River County Traffic Engineering may have underground conduit for traffic signal <br /> interconnections and equipment in this area. It shall be the contractor's responsibility to <br /> contact Sunshine State One Call System at 1-800-432-4770 for locations of this equipment at least 72 <br /> hours prior to any construction. <br /> Wyou have any questions,please contact me. <br /> F:\Traffic\Right of Way Permits - Road Closings\ROW FORMS\DRIVEWAY CONNECTION\2015\Go Line Bus <br /> Hub 1225 16th street.2015090351.approval.doc <br /> 011100-13 <br />