My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inter-Office Memorandum <br /> Indian River County-Public Works Department <br /> Traffic Engineering Division <br /> TO: David Hays,P.E.,C.F.M.,Land Development Manager <br /> FROM: Jeanne Bresett,Trac <br /> DATE: October 1,2015 <br /> SUBJECT: M O.T.for Construction in the Right-of-Way <br /> Location:122516"'Street <br /> Job Type:Go Line Bus Hub-COVB <br /> Applicant:Indian River County–Mr.Joseph Schulke,P.E. <br /> ROW Permit:2015090351 <br /> Plans dated September 11,2015: Attached are Traffic Engineering's Special Conditions for Right- <br /> of-Way Permit,as well as the Regulations for the Maintenance of Traffic for the above referenced <br /> project. Also, included are the specific F.D.O.T.Traffic Design Standard indices for the Traffic <br /> Control Plans applicable for this project. <br /> 1)The contractor shall install stand mounted Advance Construction signing,in accordance with, <br /> F.D.O.T.Standard Index 602 for any work or activities that encroaches the area between two(2) <br /> feet to fifteen(15)feet outside of the travel way. <br /> 2) Traffic shall be restricted to a single lane when any work or activities encroaches the area <br /> between the centerline and 2 feet outside of the travel.way.One-lane closures shall be in <br /> accordance with F.D.O.T.Standard Index 603. Traffic Engineering shall be notified <br /> 24 hours in advance of any lane closings. <br /> —_3)�I here shallbe no excavehons lett open atter dace—---- --- ------- -- — <br /> 4) All construction equipment and materials shall:be stored a minimum of 15 feet from the <br /> edge of pavement and shall be protected by Type 11 Barricades with flashing yellow lights. <br /> 5) Construction fencing used in the work area to protect equipment or excavations shall not block <br /> sight distance near intersections or driveways. <br /> 6) Indian River County Traffic Engineering may have underground conduit for traffic signal <br /> interconnections and equipment in this area. It shall be the contractor's responsibility to <br /> contact Sunshine State One Call System at 1-800-432-4770 for locations of this equipment at least 72 <br /> hours prior to any construction. <br /> Wyou have any questions,please contact me. <br /> F:\Traffic\Right of Way Permits - Road Closings\ROW FORMS\DRIVEWAY CONNECTION\2015\Go Line Bus <br /> Hub 1225 16th street.2015090351.approval.doc <br /> 011100-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.