My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�RIOp' <br /> INDIAN RIVER COUNTY <br /> TRAFFIC ENGINEERING DIVISION SPECIAL CONDI'T'IONS <br /> FOR RIGHT-OF-WAY CONSTRUCTION <br /> SPECIAL CONDITIONS: <br /> 1. All work performed under this permit shall be in accordance with the Florida Department of <br /> Transportation Design Standards, The Manual on Uniform Traffic Control Devices, and Indian <br /> River County Typical Drawings,latest editions. <br /> 2. All special conditions listed are, in addition to- the attached Indian River County Traffic <br /> Engineering Regulations for Maintenance of Traffic. <br /> 3. Jt shall be the contractor's responsibility to contact Sunshine State One Call-System <br /> (1-800-432-4770) at least 72 hours in advance of-commencing construction work to coordinate <br /> traffic control and obtain locations of underground traffic. signal• conduit for the County's <br /> Computerized Traffic Signal Coordination System. <br /> 4..The•contractor shall be responsible for using the applicable Traffic Control Plan for the type of <br /> work being performed All job supervisors shall have a copy of the control plan on site at all times <br /> and shall be familiar with the correct set-up of the plan. <br /> 5. At least one lane of traffic-shall be maintained at all times...One-lane•traffic shall be controlled <br /> with atJeast two (2.)-Bagn.e,n_._.Flagmen shall use STOP/$LOtiTJ_paddles at all ties. a�gs shah_ <br /> not be used for one-lane traffic control. <br /> 6. After proper notification to Traffic Engineering,consideration will be given to the contractor to <br /> close roadways to through traffic on a daily basis during daylight hours on narrow roadways where <br /> maintaining one-lane traffic would be difficult. The roadway shall be open to traffic at the end of <br /> each work day and on weekends. It shall be the contractor's responsibility to provide:all necessary <br /> construction signs and traffic control devices to close the road and provide a detour route in <br /> accordance with Indian River County standards. Signing shall be installed-that clearly indicates <br /> the time periods the road is closed to traffic. <br /> 7. •There shall be no construction work after dark. <br /> 8. All open excavations shall be back filled before the close of each work day. <br /> C:1Us=1hpayneWmIdop\1RC TRAFFIC ENGDMIZING SPECIAIAQriDTnONS FOR RIGHTDOC 92312015 <br /> 011100-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.