Laserfiche WebLink
Special Conditions for Right-of-Way Permit <br /> Page 3 <br /> It shall be the responsibility of the contractor to ensure that all subcontractors are in full compliance with <br /> all traffic control regulations. <br /> It shall be the responsibility of the contractor working on County roadways or within Right-of-Ways to <br /> establish maintenance of traffic prior to any work being performed. The contractor shall frequently <br /> .monitor the work zone set-up to ensure that all signing is properly placed and that warning signs remain at <br /> the proper advance posting distance from the work area. Any signs that do not apply to the work zone <br /> shall be removed or covered. The contractor shall remove the work zone set-up at the conclusion of the <br /> work- <br /> Traffic <br /> orkTraffic Engineering shall be notified twenty-four(24) hours in advance of any lane closings and <br /> ten(10)days in advance.of any road closures. <br /> Lane closures are restricted to outside the normal peak hours of traffic,lane closures shall occur <br /> during the hours of 9:00 AM to 4:00 PM unless otherwise approved by the Public Works <br /> Director or his designee. <br /> Traffic Engineering staff shall inspect the, Maintenance of Traffic prior to construction <br /> commencement to ensure compliance with the approved Traffic Control Plan. <br /> It is the policy of the Traffic Engineering Division to randomly monitor the contractor's compliance with <br /> all regulations while working on County roadways and within right-of-ways. Matters of public safety <br /> shall be attended to immediately upon notification by the County Public Work Director or his designee. <br /> If the contractor is found to be negligent in maintaining proper work zone set-up in accordance with the <br /> County's Right-of-Way ordinance(Chapter 312), the County Public Work Director or his designee shall <br /> impose penalties in the-amount of$250.00 for working without the proper traffic control. <br /> --Construction-at-or-Near-Signalized-Intersections:--------- _--_--_____.._—_- <br /> The contractor shall have full responsibility for any work performed at or near any traffic signals in Indian <br /> River County. The contractor shall request that the County locate buried interconnect conduit and cable,loop <br /> sensors, and pull boxes prior to commencing construction. Any damage to the interconnect conduit, loop <br /> sensors,and'pull boxes or any other traffic signal equipment shall be repaired at the contractor's expense. It <br /> shall be the responsibility of the contractor to notify Traffic Engineering Division 72 hours prior to any work <br /> being performed near a signalized intersection or flashing beacon: <br /> Once the proper notification and locate procedures are satisfied,the contractor working in or near signalized <br /> intersections 'or around traffic signal poles, signal cabinets, or flashing beacons shall be advised of the <br /> follovdng regulations: <br /> 1. No excavation shall be performed within a 15 foot radius of any traffic signal pole. If excavation is <br /> necessary within a 15 foot radius,it will be the contractors responsibility to provide the following: <br /> C:\UsM%hpayae\DmlQap\IRC TRAFFIC ENGINEERING SPECIAIMNDiTION'S FOR RIGHT-DOC gnmo15 <br /> 011100-16 <br />