My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Conditions for Right-of-Way Permit <br /> Page 3 <br /> It shall be the responsibility of the contractor to ensure that all subcontractors are in full compliance with <br /> all traffic control regulations. <br /> It shall be the responsibility of the contractor working on County roadways or within Right-of-Ways to <br /> establish maintenance of traffic prior to any work being performed. The contractor shall frequently <br /> .monitor the work zone set-up to ensure that all signing is properly placed and that warning signs remain at <br /> the proper advance posting distance from the work area. Any signs that do not apply to the work zone <br /> shall be removed or covered. The contractor shall remove the work zone set-up at the conclusion of the <br /> work- <br /> Traffic <br /> orkTraffic Engineering shall be notified twenty-four(24) hours in advance of any lane closings and <br /> ten(10)days in advance.of any road closures. <br /> Lane closures are restricted to outside the normal peak hours of traffic,lane closures shall occur <br /> during the hours of 9:00 AM to 4:00 PM unless otherwise approved by the Public Works <br /> Director or his designee. <br /> Traffic Engineering staff shall inspect the, Maintenance of Traffic prior to construction <br /> commencement to ensure compliance with the approved Traffic Control Plan. <br /> It is the policy of the Traffic Engineering Division to randomly monitor the contractor's compliance with <br /> all regulations while working on County roadways and within right-of-ways. Matters of public safety <br /> shall be attended to immediately upon notification by the County Public Work Director or his designee. <br /> If the contractor is found to be negligent in maintaining proper work zone set-up in accordance with the <br /> County's Right-of-Way ordinance(Chapter 312), the County Public Work Director or his designee shall <br /> impose penalties in the-amount of$250.00 for working without the proper traffic control. <br /> --Construction-at-or-Near-Signalized-Intersections:--------- _--_--_____.._—_- <br /> The contractor shall have full responsibility for any work performed at or near any traffic signals in Indian <br /> River County. The contractor shall request that the County locate buried interconnect conduit and cable,loop <br /> sensors, and pull boxes prior to commencing construction. Any damage to the interconnect conduit, loop <br /> sensors,and'pull boxes or any other traffic signal equipment shall be repaired at the contractor's expense. It <br /> shall be the responsibility of the contractor to notify Traffic Engineering Division 72 hours prior to any work <br /> being performed near a signalized intersection or flashing beacon: <br /> Once the proper notification and locate procedures are satisfied,the contractor working in or near signalized <br /> intersections 'or around traffic signal poles, signal cabinets, or flashing beacons shall be advised of the <br /> follovdng regulations: <br /> 1. No excavation shall be performed within a 15 foot radius of any traffic signal pole. If excavation is <br /> necessary within a 15 foot radius,it will be the contractors responsibility to provide the following: <br /> C:\UsM%hpayae\DmlQap\IRC TRAFFIC ENGINEERING SPECIAIMNDiTION'S FOR RIGHT-DOC gnmo15 <br /> 011100-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.