Laserfiche WebLink
Special Conditions for Right-of-Way Permit <br /> Page 4 <br /> a. In a manner approved by the County Public Works Director or liis designee,the contractor shall <br /> provide constant support of the traffic signal pole to prevent movement during excavation and <br /> backfill operations. <br /> b. Compaction around the excavation site to a 98%density,bringing the backfill up in 1 foot lifts. <br /> c. Density reports from a licensed testing company provided to the County Public Works <br /> Director. <br /> d., Restore the traffic signal and all support equipment to original condition or better. <br /> 2. There shall be no pavement cuts made within 500 feet of a signal or flashing beacon without <br /> contacting Indian River County Traffic Engineering•Division at (772-226-1547), 72 hours prior to <br /> construction. <br /> 3. Any traffic signal,loop sensors,conduit,interconnect cable, or any support equipment damaged by a <br /> contractor shall be repaired at the contractors expense. <br /> 4. Any contractor that works at or in the vicinity of a signalized intersection shall have full responsibility <br /> for any liability incurred by causing damage to signal equipment that results in the failure of the traffic <br /> signal functions. If such a failure occurs, the contractor shall notify the police and the Traffic <br /> Engineering Division immediately at(772-226-1547). <br /> Once the proper notification and locate procedures are satisfied,:the contractor working in or near signalized <br /> intersections or around traffic signal poles, signal cabinets, or flashing beacons shall be advised of the <br /> following regulations: <br /> 5. No excavation shall be performed within a 15 foot radius of any traffic signal pole. If excavation is <br /> necessary within a 15 foot radius,it will be the contractors responsibility to provide the following: <br /> a. In a manner approved by the County Public Works Director or his designee,the contractor shall <br /> provide constant support of the traffic signal pole to prevent movement during excavation and <br /> backfill operations. <br /> b. Compaction around the excavation,site to a 98%density,bringing the backfill up.in 1 foot lifts. <br /> c. Density reports from a licensed testing company provided to the County Public Works <br /> Director. <br /> d. Restore the traffic signal and all support equipment to original condition or Better. <br /> C:\Users\hpayne\Desldop\IRC TRAFFIC ENGINEERING SPECIAWONDITIONS FOR RIGHT.DOC 9/23/2015 <br /> 011100-17 <br />