My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Conditions for Right-of-Way Permit <br /> Page 4 <br /> a. In a manner approved by the County Public Works Director or liis designee,the contractor shall <br /> provide constant support of the traffic signal pole to prevent movement during excavation and <br /> backfill operations. <br /> b. Compaction around the excavation site to a 98%density,bringing the backfill up in 1 foot lifts. <br /> c. Density reports from a licensed testing company provided to the County Public Works <br /> Director. <br /> d., Restore the traffic signal and all support equipment to original condition or better. <br /> 2. There shall be no pavement cuts made within 500 feet of a signal or flashing beacon without <br /> contacting Indian River County Traffic Engineering•Division at (772-226-1547), 72 hours prior to <br /> construction. <br /> 3. Any traffic signal,loop sensors,conduit,interconnect cable, or any support equipment damaged by a <br /> contractor shall be repaired at the contractors expense. <br /> 4. Any contractor that works at or in the vicinity of a signalized intersection shall have full responsibility <br /> for any liability incurred by causing damage to signal equipment that results in the failure of the traffic <br /> signal functions. If such a failure occurs, the contractor shall notify the police and the Traffic <br /> Engineering Division immediately at(772-226-1547). <br /> Once the proper notification and locate procedures are satisfied,:the contractor working in or near signalized <br /> intersections or around traffic signal poles, signal cabinets, or flashing beacons shall be advised of the <br /> following regulations: <br /> 5. No excavation shall be performed within a 15 foot radius of any traffic signal pole. If excavation is <br /> necessary within a 15 foot radius,it will be the contractors responsibility to provide the following: <br /> a. In a manner approved by the County Public Works Director or his designee,the contractor shall <br /> provide constant support of the traffic signal pole to prevent movement during excavation and <br /> backfill operations. <br /> b. Compaction around the excavation,site to a 98%density,bringing the backfill up.in 1 foot lifts. <br /> c. Density reports from a licensed testing company provided to the County Public Works <br /> Director. <br /> d. Restore the traffic signal and all support equipment to original condition or Better. <br /> C:\Users\hpayne\Desldop\IRC TRAFFIC ENGINEERING SPECIAWONDITIONS FOR RIGHT.DOC 9/23/2015 <br /> 011100-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.