My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/03/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:20:24 PM
Creation date
8/10/2016 12:01:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/03/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />TRANnq <br />SPORTATION ENGINEERS & PLANNERS <br />March 18, 2016 <br />VIA E-MAIL <br />Mr. Patrick S. Walther, P.E. <br />Carter Associates, Inc <br />1708 21st Street <br />Vero Beach, Florida 32960 <br />McMANON ASSOCIATES, INC. <br />2090 Palm Beach lakes Blvd, Suite 400 1 West Palm Beach, Fl. 33409 <br />p 561-840.8650 1 f 561-840.8590 <br />mcmahonassociates.com <br />RE: US -1 at 41,d Street Signal Design Plan — Supplemental Agreement No. 2 <br />McMahon Project No. N15067.OP <br />Dear Pat: <br />PRINCIPALS <br />Joseph W. McMahon, P.E. <br />Joseph J. DeSands, P.E., PTOE <br />John S. DePalma <br />William T. Steffens <br />Casey A. Moore, P.E. <br />Gary R. McNaughton, P.E., PTOE <br />ASSOCIATES <br />John J. MitcheU, P.E. <br />Christopher J. Williams, P.E. <br />R Trent Ebersole, P.E. <br />Matthew M. Kamich, P.E. <br />Maureen Chlebek, P.E., PTOE <br />McMahon Associates, Inc. (McMahon) is pleased to provide this supplemental agreement for the US -1 <br />at 41st Street Signal Design project, in Vero Beach, Florida. This proposal is for additional services <br />related to traffic signal modification design services at the US -1/41a' Street intersection. -The-additional <br />services are for the design of a new traffic signal at the adjacent intersection of Old Dixie and 411, Street. <br />The design will require coordination with Vero Beach Power and FEC railroad. <br />This agreement is based on the assumption that all project baseline geometry, existing and proposed <br />right-of-way, topographic, geotechnical, and sub -surface utility exploration (SUE) information <br />necessary to complete the design, will be provided by Carter Associates, Inc. <br />In order to provide the proper design for the traffic signal supports, Carter Associates, Inc. must <br />provide subsurface Soil infonnation. Soil borings will be obtained in the field by a Geotechnical <br />Engineer, at all corners of the study intersection. The geotechnical information will be analyzed and <br />the project Geotechnical Engineer will provide a standard report. This information will be utilized for <br />the design of traffic signal mast arm supports. If right-of-way or other project constraints dictate that a <br />proposed mast arm base must be placed within the vicinity of an existing underground utility, then <br />Carter Associates, Inc. will provide the sub -surface utility exploration (soft dig) necessary to identify <br />the utility conflict. If additional right-of-way or easements are required for the proposed signal <br />equipment locations, Carter Associates, Inc will obtain the necessary agreements. <br />The Scope of Work includes the following tasks: <br />Corporate Headquarters: Fort Washington, Pennsylvania <br />Serving the East Coast from 13 offices throughout New England, the Mid -Atlantic, and Florida <br />94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.